WORK ORDER STATUS
First slide

#23.058.R2 PT Kilang Pertamina Internasional RU V Balikpapan Jasa Overhaul Blower dan Turbine di Boiler HHP-3 538 Days FIELD SERV (06-09-2024) - HOLD ( Waiting Electro Motor / Driven ).
#24.010 PT Pupuk Kalimantan Timur Rebabbit Bearing GB-603 Pabrik 5 523 Days PRODUCTION (06-09-2024) - Trial to Babbit Gr 7,,
#24.003.R3 PT Kilang Pertamina Internasional RU V Balikpapan Jasa Perbaikan Pompa G-201-13B 471 Days PRODUCTION (23-07-2024) - Dismantling & Cleaning Parts of Pump
#24.023.R1 PT Kilang Pertamina Internasional RU V Balikpapan Refurbishment Rotor Blower Induced Draft Fan K-8-02A 435 Days

First slide

#24.042 PT Kilang Pertamina Internasional RU IV Cilacap Pekerjaan Refurbishment Rotor & Bearing Housing Ex-Running Turbine 101P522BT PT Kilang Pertamina Internasional RU IV Cilacap 386 Days QC (06-09-2024) - Waiting customer witness
#24.052.R1 PT PLN Nusantara Power UP Gresik Rebabit Bearing Force Draft Fan Sisi DE dan NDE PLTU 4 371 Days QC (06-09-2024) - Witness customer 5 September 2024( OK )
#24.061 PT PLN Indonesia Power PLTU Jeranjang Jasa Manufacture Labyrinth Seal Sisi Inner DE, Sisi Outer NDE & Ring Oil Sisi DE 369 Days QC (06-09-2024) - Finish 98% ( final Inspeksi )
#24.056.R1 PT Japa Indotama Fabrikasi & Modifikasi Vertical Mobile Lathe 367 Days FIELD SERV (06-09-2024) - On Process Design Structure/ Konstruksi .

First slide

#24.057 PT PLN Nusantara Power UP Gresik Rebabit Journal Bearing Auxiliary Gear GT No. 3,4,5 dan 6 untuk PT PLN NP Unit Pembangkitan Gresik 366 Days QC (06-09-2024) - Finish 100%, Waiting witness customer
#24.009 PT Kilang Pertamina Internasional RU V Balikpapan Jasa Overhaul Turbine, Gearbox dan Blower di Boiler HHP V 364 Days SALES & MK (19-08-2024) - Waiting KOM..tentative starting November 2024
#24.064 PT PLN Nusantara Power UMRO Jasa Repair Oil Deflector Generator OH SE Unit 2 Up Kaltim Teluk Tahun 2024 364 Days PRODUCTION (06-09-2024) - On process Install Seal
#24.065 PT PLN Nusantara Power UMRO Jasa Repair Air Seal Generator OH SE Unit 2 UP Kaltim Teluk Tahun 2024 364 Days PRODUCTION (06-09-2024) - On Process Machining Seal

First slide

#24.050 PT PLN Nusantara Power Services Pengadaan Additional Scope SE Fabrikasi & Pemasangan Gland Sleeve Outboard Sisi HP & LP Turbine Unit 2 PLTU Ketapang 363 Days PRODUCTION (06-09-2024) - Preparation Tools On Site Service ( estimasi on site 25 spetember )
#24.066 PT PLN Nusantara Power UP Kaltim Teluk Jasa Rebabbit Bearing BFP dan Generator #6 361 Days PRODUCTION (06-09-2024) - On Process Rebabbit ( 35% )
#24.068 PT PLN Nusantara Power Services Repair Oil Deflector No. 3 & 4 Unit 1 PLTU Amurang 358 Days LOGISTIC (06-09-2024) - On Process Pengambilan Excisting Parts ke Bandara
#24.069 PT PLN Nusantara Power Services Pengadaan Jasa Perbaikan Oil Deflector Turbin Unit 1 PLTU Amurang 2024 351 Days

First slide

#24.039 PT Kilang Pertamina Internasional RU II Dumai Perbaikan 1 (Satu) Unit Turbine 940-CT-53 347 Days QC (06-09-2024) - On Process Report dan ambil data untuk syarat witness customer
#24.063 PT Green Lahat Jasa Manufaktur Wearing Drive Side, Wearing No Drive Side dan Oil Deflector 344 Days PRODUCTION (06-09-2024) - Roughing process
#24.074 PT PLN Nusantara Power Services Pengadaan Material Spring Plate Turbin PLTU Ropa 340 Days
#24.075 PT PLN Nusantara Power Services Fabrikasi dan Penggantian Seal Strip HP Gland Seal Rotor Turbin PLTU Tidore 339 Days

First slide

#24.076 PT PLN Nusantara Power Services Penggantian Seal Strip Interstage Labyrinth Seal Turbin PLTU Tidore 339 Days
#24.077.R1 PT PLN Nusantara Power Services Rebabbit Bearing BFP PLTU Tidore 339 Days
#24.073.R1 PT Pura Daya Prima Jasa Rebabbit Bearing No. 1, 2, 3, 4 dan Bearing Spare 1 & 2, Penggantian Seal Oil Deflector dan Manufacture Air Seal 338 Days
#24.060.R1 PT PLN Indonesia Power PLTU Barru Operation And Maintenance Service Unit Fabrikasi Shaft dan Assembly - Disassembly Pompa BFP 337 Days QC (06-09-2024) - Incoming Parts belum sesuai kontrak, sdg proses Marketing

First slide

#24.079 PT Supreme Energy Provision of Vacuum Pump Bearing Replacement 335 Days
#24.054 PT Kilang Pertamina Internasional RU II Dumai Pengadaan Material Non OEM Pulley Drill Steam Chamber Tag No.140-V-1B 333 Days PRODUCTION (06-09-2024) - On Progress Parts Mfg 70 % & Supply Parts 100 %
#24.072 PT Cikarang Listrindo Tbk Jasa Replacement Blade Rotor Turbine Las Stage Blade (2 EA) & Jasa Low Speed Balancing Turbine Rotor 331 Days
#24.070 PT Pura Daya Prima Jasa Overhaul Steam Turbine Generator PLTGU Musi Dua 330 Days

First slide

#24.083 PT PLN Nusantara Power Services Repair Oil Seal & Fabrikasi Spring Plate Turbin PLTU Ketapang 330 Days
#24.008.R2 PT Kilang Pertamina Internasional RU V Balikpapan Jasa Overhaul Turbine, Gearbox dan Blower di Boiler HHP IV 324 Days QC (06-09-2024) - Preparation Summary Report, Checklist Parts, dokumen inspeksi awal
#24.055.R1 PT Kaltimex Energy Manufacturing Guide Ring, Nozzle Ring & Repair Turbine model 703 W (PT.KSA) 323 Days ENGINEER (06-09-2024) - Waiting Parts Sample .
#24.081 PT PLN Nusantara Power Services Jasa Perbaikan Labyrinth Turbine Unit 2 PLTU Amurang 323 Days

First slide

#24.087 PT PLN Nusantara Power Services Fabrikasi Material Spring Labyrinth Turbine Unit 2 PLTU Amurang 323 Days
#24.085 PT PLN Nusantara Power UMRO Jasa Rebabbit H2 Seal, Bearing 5 dan 6 Generator OH ME+ #10 UP Rembang Tahun 2024 322 Days
#24.089 PT PLN Nusantara Power UMRO Jasa Penggantian Seal Carbon Teflon (Hybess 230) 320 Days
#24.091 PT Green Lahat Jasa Machining Runner 319 Days

First slide

#24.088 PT PLN Nusantara Power Services Pengadaan Jasa Rebabbit No. 2 Turbine Unit 2 PLTU Ampana 317 Days
#24.092 PT PLN Nusantara Power Services Fabrikasi Ferrule Gland Sleeve Sisi HP dan Pemasangan di Site PLTU Suge - Belitung 312 Days
#24.095 PT PLN Nusantara Power Services Jasa Penggantian Seal Strip LP Gland Seal Turbin PLTU Ampana 300 Days
#24.071 PT PLN Indonesia Power Services Pengadaan Jasa Rebabit Journal Bearing, Repair Oil Deflector dan Repair Gland Seal SE Unit 1 PLTU Tanjung Balai Karimun 296 Days

First slide

#24.096 PT PLN Nusantara Power UP Kaltim Teluk Jasa Rebabbit Bearing Generator #6 293 Days
#24.098 PT PLN Nusantara Power UMRO Jasa Rebabbit Bearing Motor PAF OH SI+ Unit 9 UP Paiton 2024 289 Days
#24.084 PT Supreme Energy Provision of Portable Lathe Rental Services for Major Outage 2024 286 Days
#24.080 PT PLN Nusantara Power Services Pengadaan Jasa Repair BFP A PLTU Ropa (WO82900) 285 Days

First slide

#24.097 PT. Sumber Segara Primadaya.( S2P ) Jasa Perbaikan Shaft FGD Absorber Pump B (RFM-2024-093) 278 Days
#24.099 PT PLN Nusantara Power Services Jasa Fabrikasi Shaft dan Coupling SA Fan Dalam Rangka Additional Job Serious Inspection Unit 2 PLTU Tidore 278 Days
#24.100 PT PLN Nusantara Power UP Gresik Jasa Rebabbit Bearing Generator GT 1.1 276 Days
#24.104 PT Ampera Musi Indah Raya Inspection Rotor Ruhrpumpen Pump 275 Days

First slide

#24.058.R1 PT Ampera Musi Indah Raya Inspection and Replacement New Rotor Ruhrpumpen Pump di SB Cilamaya OGT Field 271 Days PRODUCTION (06-09-2024) - Reschedule to persiapan on site
#24.090 PT Kilang Pertamina Internasional RU VI Balongan Refurbisment Rotor 11-K-101 & 22-K-103 –EX Major TA 2022 271 Days
#24.102 PT Pemukasakti Manisindah Rebbabit Bearing For Pinion Gear 270 Days
#24.082.R1 PT PLN Indonesia Power PLTU Jeranjang Jasa Revitalisasi Vacum Pump UBP Jeranjang 265 Days

First slide

#24.106 PT Supreme Energy Machining to Removing Blade Stage #1 & #2 on Mobile Lathe Machine for Supreme Energy Muara Laboh (SEML) 263 Days
#24.103 PT PLN Nusantara Power UP Gresik Rebabbit Bearing FD FAN Sisi DE PLTU #4 260 Days
#24.107 PT PLN Nusantara Power Services Fabrikasi Spring Plate Turbin PLTU Ketapang 260 Days
#24.108 PT Makassar Tene Jasa Rekondisi Rotor Motor 90 KW Screw Compressor 255 Days

First slide

#24.111 PT PLN Nusantara Power Services Incoming Inspection Pompa CWP PLTU Ketapang 244 Days
#24.105 PT PLN Nusantara Power UPK Punagaya Pengadaan Plate Coupling Fan Boiler Dan BFP Serious Inspection Unit 1 Tahun 2025 239 Days
#24.110 PT PLN Nusantara Power Services Jasa Repair Labyrinth / Gland Seal Dalam Rangka Additional Job Serious Inspection Unit 2 PLTU Tidore 239 Days
#25.001 PT Global Mandira Semesta Balancing Classifier Rotor 232 Days

First slide

#24.086 PT Kilang Pertamina Internasional RU II Dumai Pengadaan Spare Part Non OEM Turbine Tag No. 212-PT-75 PT Kilang Pertamina Internasional RU II Dumai 225 Days
#24.109 PT Inti Karya Persada Teknik Re-Assembly & Commisioning STG Timor-1 Coal Fired Steam Power Plant (CFSPP) 2x50 MW 221 Days
#25.005.R1 PT PLN Nusantara Power Services Fabrikasi Spring Plate PLTU Tidore Unit 2 dan Penggantian Seal Strip HP Gland Seal Sisi Inner Stator Turbin 215 Days
#25.003 PT PLN Nusantara Power Services Overhaul Pump CWP No. 3 PLTU Ketapang 209 Days

First slide

#25.004 PT Supreme Energy Steam Turbine Rotor (Ex-Running) Unit #1 SEML 208 Days
#25.006 PT PLN Nusantara Power UP Kaltim Teluk Jasa Fabrikasi Dummy Shaft 207 Days
#25.008 PT PLN Nusantara Power Services Jasa Repair Oil Deflector Bearing no 1 dan Bearing no 2 199 Days
#25.009 PT PLN Nusantara Power UPK Punagaya Jasa Rebabbit Bearing Turbin no.2 dan Bearing Turbin no.3 199 Days

First slide

#25.007 PT PLN Nusantara Power Services Penggantian Gland Sleeve Rotor Turbin Sisi LP (Inboard dan Outboard) 197 Days
#25.002 PT Kilang Pertamina Internasional RU III Plaju Jasa Overhaul Peralatan Rotating Unit Polypropylene Pada Kegiatan Yearly Maintenance Tahun 2025 195 Days
#25.010 PT PLN Nusantara Power Services Jasa Pembongkaran dan Pemasangan Gland Sleeve Sisi HP Rotor Turbin PLTU Bolok 192 Days
#25.011 PT PLN Nusantara Power Services Jasa Fabrikasi Air Seal Generator #3 dan #4 PLTU Ketapang 192 Days

First slide

#25.012 PT Green Lahat Jasa Manufacture Spesial Tools For Runner 192 Days
#25.015 PT PLN Nusantara Power UMRO Jasa Repair Inner Oil Deflector Sisi Turbine Side dan Exciter Side OH SE Unit 1 UP Pacitan 2025 191 Days
#25.014 PT Pemukasakti Manisindah Rebbabit Bearing For Pinion Gear 188 Days
#24.094 PT Kilang Pertamina Internasional RU VI Balongan Overhaul Reciprocating Compressor 12-K-501A, 12-K-501B, 22-K-101B, 21-K-101A RKAP 2024 179 Days

First slide

#25.016 PT PLN Nusantara Power UP Tanjung Awar-Awar Jasa Machining Inner Part BFPT 175 Days
#24.101 PT Kilang Pertamina Internasional RU V Balikpapan Pengadaan Material Fabrikasi Part G-33-01 ABCD 166 Days
#24.078.R1 PT Kilang Pertamina Internasional RU III Plaju Overhaul Pompa dan Turbine Boiler Feed Water P-2008 JA/JAT dan P-2008 JB/JBM 160 Days
#24.093 PT Kilang Pertamina Internasional RU V Balikpapan Jasa Overhaul Pompa Vertikal P-6 RPAL 158 Days

First slide

#25.013 PT Kilang Pertamina Internasional RU II Dumai Perbaikan Part Engine 970-PD-01D 155 Days
#25.018 PT PLN Nusantara Power Services Pengadaan Material dan Jasa Instalasi Temporary Tapping Piping HSD Dalam Rangka Relokasi PLTG MPP Tarahan #1 ke Sistem Kelistrikan Sulbagsel (Punagaya) 147 Days
#25.017 PT Kilang Pertamina Internasional RU VI Balongan Overhaul Pompa 12-P-501A dan 12-P-501B-RKAP 2023 (Warranty Job 24.004) 142 Days
#25.025 PT PLN Nusantara Power UMRO Jasa Rebabbit Bearing Motor CWP B OH ME+ #2 UP Paiton 2025 120 Days

First slide

#25.022 PT Bakti Nugraha Yuda Energy Repair Main Oil Pump Rotor Turbin PLTU Baturaja 119 Days
#25.020 PT Bakti Nugraha Yuda Energy Major Overhaul Steam Turbine Generator 109 Days
#25.027 PT Green Lahat Jasa Reverse Engineering Drawing Wearing DE, Wearing NDE dan Cover Drive Side 106 Days
#25.029 PT Digi Tekno Indonesia Jasa Low Speed Balancing Rotor Motor 96 Days

First slide

#25.028 PT PLN Nusantara Power Services Jasa Manufaktur Gland Housing Sisi HP Outer Middle Turbin Unit 2 PLTU Ropa 92 Days
#25.019 PT Bhumi Jati Power Mechanical Work of Condenser Vacuum Pump During U5 Major Maintenance 91 Days
#25.030 PT PLN Nusantara Power Services Jasa Fabrikasi Bearing Chain Grate 90 Days
#25.036 PT PLN Indonesia Power UBP Jeranjang Jasa Perbaikan Oil Deflector, Fabrikasi Spring dan Baut 81 Days

First slide

#25.032 PT PLN Nusantara Power Services Jasa Repair Oil Deflector No 3 dan Fabrikasi Air Seal Generator 80 Days
#25.038 PT PLN Indonesia Power UBP Jeranjang Jasa Perbaikan Oil Deflector dan Fabrikasi Air Seal 80 Days
#25.023 PT Karya Patra Utama Fabrikasi Inner Part 12-FV-030 78 Days
#25.031 PT PLN Nusantara Power Services Penggantian Gland Sleeve Rotor Turbin PLTU Tembilahan 78 Days

First slide

#25.039 PT PLN Nusantara Power UP Pacitan Jasa Rebabit Seal Ring Generator - MO LIS 71 Days
#25.026 PT PLN Indonesia Power UBP Sintang Jasa Overhaul MI Inspeksi Turbin Unit 3 PLTU Sintang Tahun 2025 68 Days
#25.033.R1 PT Universal Respati Turbine Engineering Welding Repair Compressor Impeller 68 Days
#25.034 PT Supreme Energy Rebabbit Bearing Housing HWP 68 Days

First slide

#25.040 PT PLN Nusantara Power UP Gresik Jasa Rebabbit Bearing Motor BFP 67 Days
#25.037 PT Makassar Tene Machining Journal Coalmill & Rebabit Bearing 66 Days
#25.041.R1 PT PLN Nusantara Power UP Gresik Jasa Rebabbit Bearing Turbin No 1 & 2 59 Days
#25.035 PT PLN Nusantara Power Services Fabrikasi Part Turbin PLTU Nii Tanasa Kendari 44 Days

First slide

#25.044 PT Pupuk Sriwidjaja Palembang Repair Bearing F4A-105JLP Turn Around P-IV 37 Days
#25.047 PT PLN Nusantara Power Services Jasa Repair Oil Deflector #1, #2, #3, #4, Manufacture Air Seal Generator, dan Manufacture Nut 35 Days
#25.043 PT PLN Nusantara Power Services Pengadaan Jasa Fabrikasi 1 Set Upper Bearing Oil Deflector PLTA Asahan (WO76117) 33 Days
#25.042 PT Rajamandala Electric Power Inspection and Repairment Of Shaft Seal and Sliding Plate 26 Days

First slide

#25.051 PT PLN Nusantara Power UP Gresik Jasa Rebabbit Bearing Motor BFP PLTU 3 23 Days
#25.046.R1 PT Rajamandala Electric Power Fabrikasi Spring and Plug 22 Days
#25.049 PT. Mogen Mechtric Power Jasa Rebabbit Bearing Generator DE dan NDE 22 Days
#25.053 PT PLN Nusantara Power UMRO Jasa Rebabbit Bearing Turbin OH GI+ PLTA Tonsealama #1 Tahun 2025 14 Days

First slide

#25.052 PT PLN Nusantara Power UP Gresik Jasa Rebabbit Bearing FDF PLTU 3 5 Days
#25.055 PT. Sumber Segara Primadaya.( S2P ) Jasa Perbaikan Shaft FGD Absorber Pump B (RFM-2025-070) 1 Days

Second slide

#25.055 PT. Sumber Segara Primadaya.( S2P ) Jasa Perbaikan Shaft FGD Absorber Pump B (RFM-2025-070) Due 1 Days
#25.057 PT PLN Nusantara Power Services Jasa Rebabbit Bearing Pompa BFP PLTU Sumbawa Due 5 Days
#25.058 PT PLN Nusantara Power Services Jasa Rebabbit Bearing Generator, Repair Oil Deflector dan Fabrikasi Air Seal Due 5 Days

Third slide

#25.054 PT PLN Nusantara Power Services 2025-09-26 2025-09-12 jumlah 10 Pengadaan Jasa Rebabbit Bearing Turbin No 1,2,3,4 Unit 1 PLTU Ampana Due 11 Days
#25.059 PT PLN Nusantara Power Services 2025-09-26 2025-09-12 jumlah 10 Pengadaan Jasa Fabrikasi Oil Proof Bearing No 3 Unit PLTU Ketapang Due 11 Days
#25.061 PT PLN Nusantara Power Services 2025-09-26 2025-09-12 jumlah 10 Jasa Penormalan Kebocoran Line Split Casing GV Dalam Rangkas Additional Job Mean Inspection PLTU Nii Tanasa Kendari Unit 3 Due 11 Days
#25.060 PT PLN Nusantara Power Services 2025-09-26 2025-09-12 jumlah 10 Pengadaan Material Fabrikasi dan Pemasangan Gland Sleeve Rotor sisi HP Unit 1 PLTU Ketapang Due 17 Days

Third slide

#25.060 PT PLN Nusantara Power Services Pengadaan Material Fabrikasi dan Pemasangan Gland Sleeve Rotor sisi HP Unit 1 PLTU Ketapang Due 17 Days
#25.050 PT Kilang Pertamina Internasional RU V Balikpapan Revisi & Update Jasa Overhaul Turbine, Gearbox dan Blower di Boiler HHP V Due 34 Days
#25.048 PT Kilang Pertamina Internasional RU II Dumai Pengadaan HP & LP Packing Tag No. 301-CT-1 RU II Dumai Due 40 Days
#25.056 PT Kilang Pertamina Internasional RU II Dumai Fabrikasi Material Non OEM Equipment 211-P-5A, 212-PT-4B, 212-PT-14B, 300-PT-9B, 310-C-1, 930-P-208 dan 211/212-P-34 A/B di RU II Dumai PT Kilang Pertamina Internasional Due 49 Days
#25.200 PT Japa Indotama Adm & Office Facility Due 118 Days