#23.058.R2 | PT Kilang Pertamina Internasional RU V Balikpapan | Jasa Overhaul Blower dan Turbine di Boiler HHP-3 | 538 Days | FIELD SERV (06-09-2024) - HOLD ( Waiting Electro Motor / Driven ). |
#24.010 | PT Pupuk Kalimantan Timur | Rebabbit Bearing GB-603 Pabrik 5 | 523 Days | PRODUCTION (06-09-2024) - Trial to Babbit Gr 7,, |
#24.003.R3 | PT Kilang Pertamina Internasional RU V Balikpapan | Jasa Perbaikan Pompa G-201-13B | 471 Days | PRODUCTION (23-07-2024) - Dismantling & Cleaning Parts of Pump |
#24.023.R1 | PT Kilang Pertamina Internasional RU V Balikpapan | Refurbishment Rotor Blower Induced Draft Fan K-8-02A | 435 Days |
#24.042 | PT Kilang Pertamina Internasional RU IV Cilacap | Pekerjaan Refurbishment Rotor & Bearing Housing Ex-Running Turbine 101P522BT PT Kilang Pertamina Internasional RU IV Cilacap | 386 Days | QC (06-09-2024) - Waiting customer witness |
#24.052.R1 | PT PLN Nusantara Power UP Gresik | Rebabit Bearing Force Draft Fan Sisi DE dan NDE PLTU 4 | 371 Days | QC (06-09-2024) - Witness customer 5 September 2024( OK ) |
#24.061 | PT PLN Indonesia Power PLTU Jeranjang | Jasa Manufacture Labyrinth Seal Sisi Inner DE, Sisi Outer NDE & Ring Oil Sisi DE | 369 Days | QC (06-09-2024) - Finish 98% ( final Inspeksi ) |
#24.056.R1 | PT Japa Indotama | Fabrikasi & Modifikasi Vertical Mobile Lathe | 367 Days | FIELD SERV (06-09-2024) - On Process Design Structure/ Konstruksi . |
#24.057 | PT PLN Nusantara Power UP Gresik | Rebabit Journal Bearing Auxiliary Gear GT No. 3,4,5 dan 6 untuk PT PLN NP Unit Pembangkitan Gresik | 366 Days | QC (06-09-2024) - Finish 100%, Waiting witness customer |
#24.009 | PT Kilang Pertamina Internasional RU V Balikpapan | Jasa Overhaul Turbine, Gearbox dan Blower di Boiler HHP V | 364 Days | SALES & MK (19-08-2024) - Waiting KOM..tentative starting November 2024 |
#24.064 | PT PLN Nusantara Power UMRO | Jasa Repair Oil Deflector Generator OH SE Unit 2 Up Kaltim Teluk Tahun 2024 | 364 Days | PRODUCTION (06-09-2024) - On process Install Seal |
#24.065 | PT PLN Nusantara Power UMRO | Jasa Repair Air Seal Generator OH SE Unit 2 UP Kaltim Teluk Tahun 2024 | 364 Days | PRODUCTION (06-09-2024) - On Process Machining Seal |
#24.050 | PT PLN Nusantara Power Services | Pengadaan Additional Scope SE Fabrikasi & Pemasangan Gland Sleeve Outboard Sisi HP & LP Turbine Unit 2 PLTU Ketapang | 363 Days | PRODUCTION (06-09-2024) - Preparation Tools On Site Service ( estimasi on site 25 spetember ) |
#24.066 | PT PLN Nusantara Power UP Kaltim Teluk | Jasa Rebabbit Bearing BFP dan Generator #6 | 361 Days | PRODUCTION (06-09-2024) - On Process Rebabbit ( 35% ) |
#24.068 | PT PLN Nusantara Power Services | Repair Oil Deflector No. 3 & 4 Unit 1 PLTU Amurang | 358 Days | LOGISTIC (06-09-2024) - On Process Pengambilan Excisting Parts ke Bandara |
#24.069 | PT PLN Nusantara Power Services | Pengadaan Jasa Perbaikan Oil Deflector Turbin Unit 1 PLTU Amurang 2024 | 351 Days |
#24.039 | PT Kilang Pertamina Internasional RU II Dumai | Perbaikan 1 (Satu) Unit Turbine 940-CT-53 | 347 Days | QC (06-09-2024) - On Process Report dan ambil data untuk syarat witness customer |
#24.063 | PT Green Lahat | Jasa Manufaktur Wearing Drive Side, Wearing No Drive Side dan Oil Deflector | 344 Days | PRODUCTION (06-09-2024) - Roughing process |
#24.074 | PT PLN Nusantara Power Services | Pengadaan Material Spring Plate Turbin PLTU Ropa | 340 Days | |
#24.075 | PT PLN Nusantara Power Services | Fabrikasi dan Penggantian Seal Strip HP Gland Seal Rotor Turbin PLTU Tidore | 339 Days |
#24.076 | PT PLN Nusantara Power Services | Penggantian Seal Strip Interstage Labyrinth Seal Turbin PLTU Tidore | 339 Days | |
#24.077.R1 | PT PLN Nusantara Power Services | Rebabbit Bearing BFP PLTU Tidore | 339 Days | |
#24.073.R1 | PT Pura Daya Prima | Jasa Rebabbit Bearing No. 1, 2, 3, 4 dan Bearing Spare 1 & 2, Penggantian Seal Oil Deflector dan Manufacture Air Seal | 338 Days | |
#24.060.R1 | PT PLN Indonesia Power PLTU Barru Operation And Maintenance Service Unit | Fabrikasi Shaft dan Assembly - Disassembly Pompa BFP | 337 Days | QC (06-09-2024) - Incoming Parts belum sesuai kontrak, sdg proses Marketing |
#24.079 | PT Supreme Energy | Provision of Vacuum Pump Bearing Replacement | 335 Days | |
#24.054 | PT Kilang Pertamina Internasional RU II Dumai | Pengadaan Material Non OEM Pulley Drill Steam Chamber Tag No.140-V-1B | 333 Days | PRODUCTION (06-09-2024) - On Progress Parts Mfg 70 % & Supply Parts 100 % |
#24.072 | PT Cikarang Listrindo Tbk | Jasa Replacement Blade Rotor Turbine Las Stage Blade (2 EA) & Jasa Low Speed Balancing Turbine Rotor | 331 Days | |
#24.070 | PT Pura Daya Prima | Jasa Overhaul Steam Turbine Generator PLTGU Musi Dua | 330 Days |
#24.083 | PT PLN Nusantara Power Services | Repair Oil Seal & Fabrikasi Spring Plate Turbin PLTU Ketapang | 330 Days | |
#24.008.R2 | PT Kilang Pertamina Internasional RU V Balikpapan | Jasa Overhaul Turbine, Gearbox dan Blower di Boiler HHP IV | 324 Days | QC (06-09-2024) - Preparation Summary Report, Checklist Parts, dokumen inspeksi awal |
#24.055.R1 | PT Kaltimex Energy | Manufacturing Guide Ring, Nozzle Ring & Repair Turbine model 703 W (PT.KSA) | 323 Days | ENGINEER (06-09-2024) - Waiting Parts Sample . |
#24.081 | PT PLN Nusantara Power Services | Jasa Perbaikan Labyrinth Turbine Unit 2 PLTU Amurang | 323 Days |
#24.087 | PT PLN Nusantara Power Services | Fabrikasi Material Spring Labyrinth Turbine Unit 2 PLTU Amurang | 323 Days | |
#24.085 | PT PLN Nusantara Power UMRO | Jasa Rebabbit H2 Seal, Bearing 5 dan 6 Generator OH ME+ #10 UP Rembang Tahun 2024 | 322 Days | |
#24.089 | PT PLN Nusantara Power UMRO | Jasa Penggantian Seal Carbon Teflon (Hybess 230) | 320 Days | |
#24.091 | PT Green Lahat | Jasa Machining Runner | 319 Days |
#24.088 | PT PLN Nusantara Power Services | Pengadaan Jasa Rebabbit No. 2 Turbine Unit 2 PLTU Ampana | 317 Days | |
#24.092 | PT PLN Nusantara Power Services | Fabrikasi Ferrule Gland Sleeve Sisi HP dan Pemasangan di Site PLTU Suge - Belitung | 312 Days | |
#24.095 | PT PLN Nusantara Power Services | Jasa Penggantian Seal Strip LP Gland Seal Turbin PLTU Ampana | 300 Days | |
#24.071 | PT PLN Indonesia Power Services | Pengadaan Jasa Rebabit Journal Bearing, Repair Oil Deflector dan Repair Gland Seal SE Unit 1 PLTU Tanjung Balai Karimun | 296 Days |
#24.096 | PT PLN Nusantara Power UP Kaltim Teluk | Jasa Rebabbit Bearing Generator #6 | 293 Days | |
#24.098 | PT PLN Nusantara Power UMRO | Jasa Rebabbit Bearing Motor PAF OH SI+ Unit 9 UP Paiton 2024 | 289 Days | |
#24.084 | PT Supreme Energy | Provision of Portable Lathe Rental Services for Major Outage 2024 | 286 Days | |
#24.080 | PT PLN Nusantara Power Services | Pengadaan Jasa Repair BFP A PLTU Ropa (WO82900) | 285 Days |
#24.097 | PT. Sumber Segara Primadaya.( S2P ) | Jasa Perbaikan Shaft FGD Absorber Pump B (RFM-2024-093) | 278 Days | |
#24.099 | PT PLN Nusantara Power Services | Jasa Fabrikasi Shaft dan Coupling SA Fan Dalam Rangka Additional Job Serious Inspection Unit 2 PLTU Tidore | 278 Days | |
#24.100 | PT PLN Nusantara Power UP Gresik | Jasa Rebabbit Bearing Generator GT 1.1 | 276 Days | |
#24.104 | PT Ampera Musi Indah Raya | Inspection Rotor Ruhrpumpen Pump | 275 Days |
#24.058.R1 | PT Ampera Musi Indah Raya | Inspection and Replacement New Rotor Ruhrpumpen Pump di SB Cilamaya OGT Field | 271 Days | PRODUCTION (06-09-2024) - Reschedule to persiapan on site |
#24.090 | PT Kilang Pertamina Internasional RU VI Balongan | Refurbisment Rotor 11-K-101 & 22-K-103 –EX Major TA 2022 | 271 Days | |
#24.102 | PT Pemukasakti Manisindah | Rebbabit Bearing For Pinion Gear | 270 Days | |
#24.082.R1 | PT PLN Indonesia Power PLTU Jeranjang | Jasa Revitalisasi Vacum Pump UBP Jeranjang | 265 Days |
#24.106 | PT Supreme Energy | Machining to Removing Blade Stage #1 & #2 on Mobile Lathe Machine for Supreme Energy Muara Laboh (SEML) | 263 Days | |
#24.103 | PT PLN Nusantara Power UP Gresik | Rebabbit Bearing FD FAN Sisi DE PLTU #4 | 260 Days | |
#24.107 | PT PLN Nusantara Power Services | Fabrikasi Spring Plate Turbin PLTU Ketapang | 260 Days | |
#24.108 | PT Makassar Tene | Jasa Rekondisi Rotor Motor 90 KW Screw Compressor | 255 Days |
#24.111 | PT PLN Nusantara Power Services | Incoming Inspection Pompa CWP PLTU Ketapang | 244 Days | |
#24.105 | PT PLN Nusantara Power UPK Punagaya | Pengadaan Plate Coupling Fan Boiler Dan BFP Serious Inspection Unit 1 Tahun 2025 | 239 Days | |
#24.110 | PT PLN Nusantara Power Services | Jasa Repair Labyrinth / Gland Seal Dalam Rangka Additional Job Serious Inspection Unit 2 PLTU Tidore | 239 Days | |
#25.001 | PT Global Mandira Semesta | Balancing Classifier Rotor | 232 Days |
#24.086 | PT Kilang Pertamina Internasional RU II Dumai | Pengadaan Spare Part Non OEM Turbine Tag No. 212-PT-75 PT Kilang Pertamina Internasional RU II Dumai | 225 Days | |
#24.109 | PT Inti Karya Persada Teknik | Re-Assembly & Commisioning STG Timor-1 Coal Fired Steam Power Plant (CFSPP) 2x50 MW | 221 Days | |
#25.005.R1 | PT PLN Nusantara Power Services | Fabrikasi Spring Plate PLTU Tidore Unit 2 dan Penggantian Seal Strip HP Gland Seal Sisi Inner Stator Turbin | 215 Days | |
#25.003 | PT PLN Nusantara Power Services | Overhaul Pump CWP No. 3 PLTU Ketapang | 209 Days |
#25.004 | PT Supreme Energy | Steam Turbine Rotor (Ex-Running) Unit #1 SEML | 208 Days | |
#25.006 | PT PLN Nusantara Power UP Kaltim Teluk | Jasa Fabrikasi Dummy Shaft | 207 Days | |
#25.008 | PT PLN Nusantara Power Services | Jasa Repair Oil Deflector Bearing no 1 dan Bearing no 2 | 199 Days | |
#25.009 | PT PLN Nusantara Power UPK Punagaya | Jasa Rebabbit Bearing Turbin no.2 dan Bearing Turbin no.3 | 199 Days |
#25.007 | PT PLN Nusantara Power Services | Penggantian Gland Sleeve Rotor Turbin Sisi LP (Inboard dan Outboard) | 197 Days | |
#25.002 | PT Kilang Pertamina Internasional RU III Plaju | Jasa Overhaul Peralatan Rotating Unit Polypropylene Pada Kegiatan Yearly Maintenance Tahun 2025 | 195 Days | |
#25.010 | PT PLN Nusantara Power Services | Jasa Pembongkaran dan Pemasangan Gland Sleeve Sisi HP Rotor Turbin PLTU Bolok | 192 Days | |
#25.011 | PT PLN Nusantara Power Services | Jasa Fabrikasi Air Seal Generator #3 dan #4 PLTU Ketapang | 192 Days |
#25.012 | PT Green Lahat | Jasa Manufacture Spesial Tools For Runner | 192 Days | |
#25.015 | PT PLN Nusantara Power UMRO | Jasa Repair Inner Oil Deflector Sisi Turbine Side dan Exciter Side OH SE Unit 1 UP Pacitan 2025 | 191 Days | |
#25.014 | PT Pemukasakti Manisindah | Rebbabit Bearing For Pinion Gear | 188 Days | |
#24.094 | PT Kilang Pertamina Internasional RU VI Balongan | Overhaul Reciprocating Compressor 12-K-501A, 12-K-501B, 22-K-101B, 21-K-101A RKAP 2024 | 179 Days |
#25.016 | PT PLN Nusantara Power UP Tanjung Awar-Awar | Jasa Machining Inner Part BFPT | 175 Days | |
#24.101 | PT Kilang Pertamina Internasional RU V Balikpapan | Pengadaan Material Fabrikasi Part G-33-01 ABCD | 166 Days | |
#24.078.R1 | PT Kilang Pertamina Internasional RU III Plaju | Overhaul Pompa dan Turbine Boiler Feed Water P-2008 JA/JAT dan P-2008 JB/JBM | 160 Days | |
#24.093 | PT Kilang Pertamina Internasional RU V Balikpapan | Jasa Overhaul Pompa Vertikal P-6 RPAL | 158 Days |
#25.013 | PT Kilang Pertamina Internasional RU II Dumai | Perbaikan Part Engine 970-PD-01D | 155 Days | |
#25.018 | PT PLN Nusantara Power Services | Pengadaan Material dan Jasa Instalasi Temporary Tapping Piping HSD Dalam Rangka Relokasi PLTG MPP Tarahan #1 ke Sistem Kelistrikan Sulbagsel (Punagaya) | 147 Days | |
#25.017 | PT Kilang Pertamina Internasional RU VI Balongan | Overhaul Pompa 12-P-501A dan 12-P-501B-RKAP 2023 (Warranty Job 24.004) | 142 Days | |
#25.025 | PT PLN Nusantara Power UMRO | Jasa Rebabbit Bearing Motor CWP B OH ME+ #2 UP Paiton 2025 | 120 Days |
#25.022 | PT Bakti Nugraha Yuda Energy | Repair Main Oil Pump Rotor Turbin PLTU Baturaja | 119 Days | |
#25.020 | PT Bakti Nugraha Yuda Energy | Major Overhaul Steam Turbine Generator | 109 Days | |
#25.027 | PT Green Lahat | Jasa Reverse Engineering Drawing Wearing DE, Wearing NDE dan Cover Drive Side | 106 Days | |
#25.029 | PT Digi Tekno Indonesia | Jasa Low Speed Balancing Rotor Motor | 96 Days |
#25.028 | PT PLN Nusantara Power Services | Jasa Manufaktur Gland Housing Sisi HP Outer Middle Turbin Unit 2 PLTU Ropa | 92 Days | |
#25.019 | PT Bhumi Jati Power | Mechanical Work of Condenser Vacuum Pump During U5 Major Maintenance | 91 Days | |
#25.030 | PT PLN Nusantara Power Services | Jasa Fabrikasi Bearing Chain Grate | 90 Days | |
#25.036 | PT PLN Indonesia Power UBP Jeranjang | Jasa Perbaikan Oil Deflector, Fabrikasi Spring dan Baut | 81 Days |
#25.032 | PT PLN Nusantara Power Services | Jasa Repair Oil Deflector No 3 dan Fabrikasi Air Seal Generator | 80 Days | |
#25.038 | PT PLN Indonesia Power UBP Jeranjang | Jasa Perbaikan Oil Deflector dan Fabrikasi Air Seal | 80 Days | |
#25.023 | PT Karya Patra Utama | Fabrikasi Inner Part 12-FV-030 | 78 Days | |
#25.031 | PT PLN Nusantara Power Services | Penggantian Gland Sleeve Rotor Turbin PLTU Tembilahan | 78 Days |
#25.039 | PT PLN Nusantara Power UP Pacitan | Jasa Rebabit Seal Ring Generator - MO LIS | 71 Days | |
#25.026 | PT PLN Indonesia Power UBP Sintang | Jasa Overhaul MI Inspeksi Turbin Unit 3 PLTU Sintang Tahun 2025 | 68 Days | |
#25.033.R1 | PT Universal Respati Turbine Engineering | Welding Repair Compressor Impeller | 68 Days | |
#25.034 | PT Supreme Energy | Rebabbit Bearing Housing HWP | 68 Days |
#25.040 | PT PLN Nusantara Power UP Gresik | Jasa Rebabbit Bearing Motor BFP | 67 Days | |
#25.037 | PT Makassar Tene | Machining Journal Coalmill & Rebabit Bearing | 66 Days | |
#25.041.R1 | PT PLN Nusantara Power UP Gresik | Jasa Rebabbit Bearing Turbin No 1 & 2 | 59 Days | |
#25.035 | PT PLN Nusantara Power Services | Fabrikasi Part Turbin PLTU Nii Tanasa Kendari | 44 Days |
#25.044 | PT Pupuk Sriwidjaja Palembang | Repair Bearing F4A-105JLP Turn Around P-IV | 37 Days | |
#25.047 | PT PLN Nusantara Power Services | Jasa Repair Oil Deflector #1, #2, #3, #4, Manufacture Air Seal Generator, dan Manufacture Nut | 35 Days | |
#25.043 | PT PLN Nusantara Power Services | Pengadaan Jasa Fabrikasi 1 Set Upper Bearing Oil Deflector PLTA Asahan (WO76117) | 33 Days | |
#25.042 | PT Rajamandala Electric Power | Inspection and Repairment Of Shaft Seal and Sliding Plate | 26 Days |
#25.051 | PT PLN Nusantara Power UP Gresik | Jasa Rebabbit Bearing Motor BFP PLTU 3 | 23 Days | |
#25.046.R1 | PT Rajamandala Electric Power | Fabrikasi Spring and Plug | 22 Days | |
#25.049 | PT. Mogen Mechtric Power | Jasa Rebabbit Bearing Generator DE dan NDE | 22 Days | |
#25.053 | PT PLN Nusantara Power UMRO | Jasa Rebabbit Bearing Turbin OH GI+ PLTA Tonsealama #1 Tahun 2025 | 14 Days |
#25.052 | PT PLN Nusantara Power UP Gresik | Jasa Rebabbit Bearing FDF PLTU 3 | 5 Days | |
#25.055 | PT. Sumber Segara Primadaya.( S2P ) | Jasa Perbaikan Shaft FGD Absorber Pump B (RFM-2025-070) | 1 Days |
#25.055 | PT. Sumber Segara Primadaya.( S2P ) | Jasa Perbaikan Shaft FGD Absorber Pump B (RFM-2025-070) | Due 1 Days | |
#25.057 | PT PLN Nusantara Power Services | Jasa Rebabbit Bearing Pompa BFP PLTU Sumbawa | Due 5 Days | |
#25.058 | PT PLN Nusantara Power Services | Jasa Rebabbit Bearing Generator, Repair Oil Deflector dan Fabrikasi Air Seal | Due 5 Days |
#25.054 | PT PLN Nusantara Power Services 2025-09-26 2025-09-12 jumlah 10 | Pengadaan Jasa Rebabbit Bearing Turbin No 1,2,3,4 Unit 1 PLTU Ampana | Due 11 Days | |
#25.059 | PT PLN Nusantara Power Services 2025-09-26 2025-09-12 jumlah 10 | Pengadaan Jasa Fabrikasi Oil Proof Bearing No 3 Unit PLTU Ketapang | Due 11 Days | |
#25.061 | PT PLN Nusantara Power Services 2025-09-26 2025-09-12 jumlah 10 | Jasa Penormalan Kebocoran Line Split Casing GV Dalam Rangkas Additional Job Mean Inspection PLTU Nii Tanasa Kendari Unit 3 | Due 11 Days | |
#25.060 | PT PLN Nusantara Power Services 2025-09-26 2025-09-12 jumlah 10 | Pengadaan Material Fabrikasi dan Pemasangan Gland Sleeve Rotor sisi HP Unit 1 PLTU Ketapang | Due 17 Days |
#25.060 | PT PLN Nusantara Power Services | Pengadaan Material Fabrikasi dan Pemasangan Gland Sleeve Rotor sisi HP Unit 1 PLTU Ketapang | Due 17 Days | |
#25.050 | PT Kilang Pertamina Internasional RU V Balikpapan | Revisi & Update Jasa Overhaul Turbine, Gearbox dan Blower di Boiler HHP V | Due 34 Days | |
#25.048 | PT Kilang Pertamina Internasional RU II Dumai | Pengadaan HP & LP Packing Tag No. 301-CT-1 RU II Dumai | Due 40 Days | |
#25.056 | PT Kilang Pertamina Internasional RU II Dumai | Fabrikasi Material Non OEM Equipment 211-P-5A, 212-PT-4B, 212-PT-14B, 300-PT-9B, 310-C-1, 930-P-208 dan 211/212-P-34 A/B di RU II Dumai PT Kilang Pertamina Internasional | Due 49 Days | |
#25.200 | PT Japa Indotama | Adm & Office Facility | Due 118 Days |