| #23.058.R2 | PT Kilang Pertamina Internasional RU V Balikpapan | Jasa Overhaul Blower dan Turbine di Boiler HHP-3 | 755 Days | FIELD SERV (06-09-2024) - HOLD ( Waiting Electro Motor / Driven ). |
| #24.010 | PT Pupuk Kalimantan Timur | Rebabbit Bearing GB-603 Pabrik 5 | 740 Days | PRODUCTION (06-09-2024) - Trial to Babbit Gr 7,, |
| #24.003.R3 | PT Kilang Pertamina Internasional RU V Balikpapan | Jasa Perbaikan Pompa G-201-13B | 688 Days | PRODUCTION (23-07-2024) - Dismantling & Cleaning Parts of Pump |
| #24.023.R1 | PT Kilang Pertamina Internasional RU V Balikpapan | Refurbishment Rotor Blower Induced Draft Fan K-8-02A | 652 Days |
| #24.042 | PT Kilang Pertamina Internasional RU IV Cilacap | Pekerjaan Refurbishment Rotor & Bearing Housing Ex-Running Turbine 101P522BT PT Kilang Pertamina Internasional RU IV Cilacap | 603 Days | QC (06-09-2024) - Waiting customer witness |
| #24.052.R1 | PT PLN Nusantara Power UP Gresik | Rebabit Bearing Force Draft Fan Sisi DE dan NDE PLTU 4 | 588 Days | QC (06-09-2024) - Witness customer 5 September 2024( OK ) |
| #24.061 | PT PLN Indonesia Power PLTU Jeranjang | Jasa Manufacture Labyrinth Seal Sisi Inner DE, Sisi Outer NDE & Ring Oil Sisi DE | 586 Days | QC (06-09-2024) - Finish 98% ( final Inspeksi ) |
| #24.056.R1 | PT Japa Indotama | Fabrikasi & Modifikasi Vertical Mobile Lathe | 584 Days | FIELD SERV (06-09-2024) - On Process Design Structure/ Konstruksi . |
| #24.057 | PT PLN Nusantara Power UP Gresik | Rebabit Journal Bearing Auxiliary Gear GT No. 3,4,5 dan 6 untuk PT PLN NP Unit Pembangkitan Gresik | 583 Days | QC (06-09-2024) - Finish 100%, Waiting witness customer |
| #24.009 | PT Kilang Pertamina Internasional RU V Balikpapan | Jasa Overhaul Turbine, Gearbox dan Blower di Boiler HHP V | 581 Days | SALES & MK (19-08-2024) - Waiting KOM..tentative starting November 2024 |
| #24.064 | PT PLN Nusantara Power UMRO | Jasa Repair Oil Deflector Generator OH SE Unit 2 Up Kaltim Teluk Tahun 2024 | 581 Days | PRODUCTION (06-09-2024) - On process Install Seal |
| #24.065 | PT PLN Nusantara Power UMRO | Jasa Repair Air Seal Generator OH SE Unit 2 UP Kaltim Teluk Tahun 2024 | 581 Days | PRODUCTION (06-09-2024) - On Process Machining Seal |
| #24.050 | PT PLN Nusantara Power Services | Pengadaan Additional Scope SE Fabrikasi & Pemasangan Gland Sleeve Outboard Sisi HP & LP Turbine Unit 2 PLTU Ketapang | 580 Days | PRODUCTION (06-09-2024) - Preparation Tools On Site Service ( estimasi on site 25 spetember ) |
| #24.066 | PT PLN Nusantara Power UP Kaltim Teluk | Jasa Rebabbit Bearing BFP dan Generator #6 | 578 Days | PRODUCTION (06-09-2024) - On Process Rebabbit ( 35% ) |
| #24.068 | PT PLN Nusantara Power Services | Repair Oil Deflector No. 3 & 4 Unit 1 PLTU Amurang | 575 Days | LOGISTIC (06-09-2024) - On Process Pengambilan Excisting Parts ke Bandara |
| #24.069 | PT PLN Nusantara Power Services | Pengadaan Jasa Perbaikan Oil Deflector Turbin Unit 1 PLTU Amurang 2024 | 568 Days |
| #24.039 | PT Kilang Pertamina Internasional RU II Dumai | Perbaikan 1 (Satu) Unit Turbine 940-CT-53 | 564 Days | QC (06-09-2024) - On Process Report dan ambil data untuk syarat witness customer |
| #24.063 | PT Green Lahat | Jasa Manufaktur Wearing Drive Side, Wearing No Drive Side dan Oil Deflector | 561 Days | PRODUCTION (06-09-2024) - Roughing process |
| #24.074 | PT PLN Nusantara Power Services | Pengadaan Material Spring Plate Turbin PLTU Ropa | 557 Days | |
| #24.075 | PT PLN Nusantara Power Services | Fabrikasi dan Penggantian Seal Strip HP Gland Seal Rotor Turbin PLTU Tidore | 556 Days |
| #24.076 | PT PLN Nusantara Power Services | Penggantian Seal Strip Interstage Labyrinth Seal Turbin PLTU Tidore | 556 Days | |
| #24.077.R1 | PT PLN Nusantara Power Services | Rebabbit Bearing BFP PLTU Tidore | 556 Days | |
| #24.073.R1 | PT Pura Daya Prima | Jasa Rebabbit Bearing No. 1, 2, 3, 4 dan Bearing Spare 1 & 2, Penggantian Seal Oil Deflector dan Manufacture Air Seal | 555 Days | |
| #24.060.R1 | PT PLN Indonesia Power PLTU Barru Operation And Maintenance Service Unit | Fabrikasi Shaft dan Assembly - Disassembly Pompa BFP | 554 Days | QC (06-09-2024) - Incoming Parts belum sesuai kontrak, sdg proses Marketing |
| #24.079 | PT Supreme Energy | Provision of Vacuum Pump Bearing Replacement | 552 Days | |
| #24.054 | PT Kilang Pertamina Internasional RU II Dumai | Pengadaan Material Non OEM Pulley Drill Steam Chamber Tag No.140-V-1B | 550 Days | PRODUCTION (06-09-2024) - On Progress Parts Mfg 70 % & Supply Parts 100 % |
| #24.072 | PT Cikarang Listrindo Tbk | Jasa Replacement Blade Rotor Turbine Las Stage Blade (2 EA) & Jasa Low Speed Balancing Turbine Rotor | 548 Days | |
| #24.070 | PT Pura Daya Prima | Jasa Overhaul Steam Turbine Generator PLTGU Musi Dua | 547 Days |
| #24.083 | PT PLN Nusantara Power Services | Repair Oil Seal & Fabrikasi Spring Plate Turbin PLTU Ketapang | 547 Days | |
| #24.008.R2 | PT Kilang Pertamina Internasional RU V Balikpapan | Jasa Overhaul Turbine, Gearbox dan Blower di Boiler HHP IV | 541 Days | QC (06-09-2024) - Preparation Summary Report, Checklist Parts, dokumen inspeksi awal |
| #24.055.R1 | PT Kaltimex Energy | Manufacturing Guide Ring, Nozzle Ring & Repair Turbine model 703 W (PT.KSA) | 540 Days | ENGINEER (06-09-2024) - Waiting Parts Sample . |
| #24.081 | PT PLN Nusantara Power Services | Jasa Perbaikan Labyrinth Turbine Unit 2 PLTU Amurang | 540 Days |
| #24.087 | PT PLN Nusantara Power Services | Fabrikasi Material Spring Labyrinth Turbine Unit 2 PLTU Amurang | 540 Days | |
| #24.085 | PT PLN Nusantara Power UMRO | Jasa Rebabbit H2 Seal, Bearing 5 dan 6 Generator OH ME+ #10 UP Rembang Tahun 2024 | 539 Days | |
| #24.089 | PT PLN Nusantara Power UMRO | Jasa Penggantian Seal Carbon Teflon (Hybess 230) | 537 Days | |
| #24.091 | PT Green Lahat | Jasa Machining Runner | 536 Days |
| #24.088 | PT PLN Nusantara Power Services | Pengadaan Jasa Rebabbit No. 2 Turbine Unit 2 PLTU Ampana | 534 Days | |
| #24.092 | PT PLN Nusantara Power Services | Fabrikasi Ferrule Gland Sleeve Sisi HP dan Pemasangan di Site PLTU Suge - Belitung | 529 Days | |
| #24.095 | PT PLN Nusantara Power Services | Jasa Penggantian Seal Strip LP Gland Seal Turbin PLTU Ampana | 517 Days | |
| #24.071 | PT PLN Indonesia Power Services | Pengadaan Jasa Rebabit Journal Bearing, Repair Oil Deflector dan Repair Gland Seal SE Unit 1 PLTU Tanjung Balai Karimun | 513 Days |
| #24.096 | PT PLN Nusantara Power UP Kaltim Teluk | Jasa Rebabbit Bearing Generator #6 | 510 Days | |
| #24.098 | PT PLN Nusantara Power UMRO | Jasa Rebabbit Bearing Motor PAF OH SI+ Unit 9 UP Paiton 2024 | 506 Days | |
| #24.084 | PT Supreme Energy | Provision of Portable Lathe Rental Services for Major Outage 2024 | 503 Days | |
| #24.080 | PT PLN Nusantara Power Services | Pengadaan Jasa Repair BFP A PLTU Ropa (WO82900) | 502 Days |
| #24.097 | PT. Sumber Segara Primadaya.( S2P ) | Jasa Perbaikan Shaft FGD Absorber Pump B (RFM-2024-093) | 495 Days | |
| #24.099 | PT PLN Nusantara Power Services | Jasa Fabrikasi Shaft dan Coupling SA Fan Dalam Rangka Additional Job Serious Inspection Unit 2 PLTU Tidore | 495 Days | |
| #24.100 | PT PLN Nusantara Power UP Gresik | Jasa Rebabbit Bearing Generator GT 1.1 | 493 Days | |
| #24.104 | PT Ampera Musi Indah Raya | Inspection Rotor Ruhrpumpen Pump | 492 Days |
| #24.058.R1 | PT Ampera Musi Indah Raya | Inspection and Replacement New Rotor Ruhrpumpen Pump di SB Cilamaya OGT Field | 488 Days | PRODUCTION (06-09-2024) - Reschedule to persiapan on site |
| #24.090 | PT Kilang Pertamina Internasional RU VI Balongan | Refurbisment Rotor 11-K-101 & 22-K-103 –EX Major TA 2022 | 488 Days | |
| #24.102 | PT Pemukasakti Manisindah | Rebbabit Bearing For Pinion Gear | 487 Days | |
| #24.082.R1 | PT PLN Indonesia Power PLTU Jeranjang | Jasa Revitalisasi Vacum Pump UBP Jeranjang | 482 Days |
| #24.106 | PT Supreme Energy | Machining to Removing Blade Stage #1 & #2 on Mobile Lathe Machine for Supreme Energy Muara Laboh (SEML) | 480 Days | |
| #24.103 | PT PLN Nusantara Power UP Gresik | Rebabbit Bearing FD FAN Sisi DE PLTU #4 | 477 Days | |
| #24.107 | PT PLN Nusantara Power Services | Fabrikasi Spring Plate Turbin PLTU Ketapang | 477 Days | |
| #24.108 | PT Makassar Tene | Jasa Rekondisi Rotor Motor 90 KW Screw Compressor | 472 Days |
| #24.111 | PT PLN Nusantara Power Services | Incoming Inspection Pompa CWP PLTU Ketapang | 461 Days | |
| #24.105 | PT PLN Nusantara Power UPK Punagaya | Pengadaan Plate Coupling Fan Boiler Dan BFP Serious Inspection Unit 1 Tahun 2025 | 456 Days | |
| #24.110 | PT PLN Nusantara Power Services | Jasa Repair Labyrinth / Gland Seal Dalam Rangka Additional Job Serious Inspection Unit 2 PLTU Tidore | 456 Days | |
| #25.001 | PT Global Mandira Semesta | Balancing Classifier Rotor | 449 Days |
| #24.086 | PT Kilang Pertamina Internasional RU II Dumai | Pengadaan Spare Part Non OEM Turbine Tag No. 212-PT-75 PT Kilang Pertamina Internasional RU II Dumai | 442 Days | |
| #24.109 | PT Inti Karya Persada Teknik | Re-Assembly & Commisioning STG Timor-1 Coal Fired Steam Power Plant (CFSPP) 2x50 MW | 438 Days | |
| #25.005.R1 | PT PLN Nusantara Power Services | Fabrikasi Spring Plate PLTU Tidore Unit 2 dan Penggantian Seal Strip HP Gland Seal Sisi Inner Stator Turbin | 432 Days | |
| #25.003 | PT PLN Nusantara Power Services | Overhaul Pump CWP No. 3 PLTU Ketapang | 426 Days |
| #25.004 | PT Supreme Energy | Steam Turbine Rotor (Ex-Running) Unit #1 SEML | 425 Days | |
| #25.006 | PT PLN Nusantara Power UP Kaltim Teluk | Jasa Fabrikasi Dummy Shaft | 424 Days | |
| #25.008 | PT PLN Nusantara Power Services | Jasa Repair Oil Deflector Bearing no 1 dan Bearing no 2 | 416 Days | |
| #25.009 | PT PLN Nusantara Power UPK Punagaya | Jasa Rebabbit Bearing Turbin no.2 dan Bearing Turbin no.3 | 416 Days |
| #25.007 | PT PLN Nusantara Power Services | Penggantian Gland Sleeve Rotor Turbin Sisi LP (Inboard dan Outboard) | 414 Days | |
| #25.002 | PT Kilang Pertamina Internasional RU III Plaju | Jasa Overhaul Peralatan Rotating Unit Polypropylene Pada Kegiatan Yearly Maintenance Tahun 2025 | 412 Days | |
| #25.010 | PT PLN Nusantara Power Services | Jasa Pembongkaran dan Pemasangan Gland Sleeve Sisi HP Rotor Turbin PLTU Bolok | 409 Days | |
| #25.011 | PT PLN Nusantara Power Services | Jasa Fabrikasi Air Seal Generator #3 dan #4 PLTU Ketapang | 409 Days |
| #25.012 | PT Green Lahat | Jasa Manufacture Spesial Tools For Runner | 409 Days | |
| #25.015 | PT PLN Nusantara Power UMRO | Jasa Repair Inner Oil Deflector Sisi Turbine Side dan Exciter Side OH SE Unit 1 UP Pacitan 2025 | 408 Days | |
| #25.014 | PT Pemukasakti Manisindah | Rebbabit Bearing For Pinion Gear | 405 Days | |
| #24.094 | PT Kilang Pertamina Internasional RU VI Balongan | Overhaul Reciprocating Compressor 12-K-501A, 12-K-501B, 22-K-101B, 21-K-101A RKAP 2024 | 396 Days |
| #25.016 | PT PLN Nusantara Power UP Tanjung Awar-Awar | Jasa Machining Inner Part BFPT | 392 Days | |
| #24.101 | PT Kilang Pertamina Internasional RU V Balikpapan | Pengadaan Material Fabrikasi Part G-33-01 ABCD | 383 Days | |
| #24.078.R1 | PT Kilang Pertamina Internasional RU III Plaju | Overhaul Pompa dan Turbine Boiler Feed Water P-2008 JA/JAT dan P-2008 JB/JBM | 377 Days | |
| #24.093 | PT Kilang Pertamina Internasional RU V Balikpapan | Jasa Overhaul Pompa Vertikal P-6 RPAL | 375 Days |
| #25.013 | PT Kilang Pertamina Internasional RU II Dumai | Perbaikan Part Engine 970-PD-01D | 372 Days | |
| #25.018 | PT PLN Nusantara Power Services | Pengadaan Material dan Jasa Instalasi Temporary Tapping Piping HSD Dalam Rangka Relokasi PLTG MPP Tarahan #1 ke Sistem Kelistrikan Sulbagsel (Punagaya) | 364 Days | |
| #25.017 | PT Kilang Pertamina Internasional RU VI Balongan | Overhaul Pompa 12-P-501A dan 12-P-501B-RKAP 2023 (Warranty Job 24.004) | 359 Days | |
| #25.025 | PT PLN Nusantara Power UMRO | Jasa Rebabbit Bearing Motor CWP B OH ME+ #2 UP Paiton 2025 | 337 Days |
| #25.022 | PT Bakti Nugraha Yuda Energy | Repair Main Oil Pump Rotor Turbin PLTU Baturaja | 336 Days | |
| #25.020 | PT Bakti Nugraha Yuda Energy | Major Overhaul Steam Turbine Generator | 326 Days | |
| #25.027 | PT Green Lahat | Jasa Reverse Engineering Drawing Wearing DE, Wearing NDE dan Cover Drive Side | 323 Days | |
| #25.029 | PT Digi Tekno Indonesia | Jasa Low Speed Balancing Rotor Motor | 313 Days |
| #25.028 | PT PLN Nusantara Power Services | Jasa Manufaktur Gland Housing Sisi HP Outer Middle Turbin Unit 2 PLTU Ropa | 309 Days | |
| #25.019 | PT Bhumi Jati Power | Mechanical Work of Condenser Vacuum Pump During U5 Major Maintenance | 308 Days | |
| #25.030 | PT PLN Nusantara Power Services | Jasa Fabrikasi Bearing Chain Grate | 307 Days | |
| #25.036 | PT PLN Indonesia Power UBP Jeranjang | Jasa Perbaikan Oil Deflector, Fabrikasi Spring dan Baut | 298 Days |
| #25.032 | PT PLN Nusantara Power Services | Jasa Repair Oil Deflector No 3 dan Fabrikasi Air Seal Generator | 297 Days | |
| #25.038 | PT PLN Indonesia Power UBP Jeranjang | Jasa Perbaikan Oil Deflector dan Fabrikasi Air Seal | 297 Days | |
| #25.023 | PT Karya Patra Utama | Fabrikasi Inner Part 12-FV-030 | 295 Days | |
| #25.031 | PT PLN Nusantara Power Services | Penggantian Gland Sleeve Rotor Turbin PLTU Tembilahan | 295 Days |
| #25.039 | PT PLN Nusantara Power UP Pacitan | Jasa Rebabit Seal Ring Generator - MO LIS | 288 Days | |
| #25.026 | PT PLN Indonesia Power UBP Sintang | Jasa Overhaul MI Inspeksi Turbin Unit 3 PLTU Sintang Tahun 2025 | 285 Days | |
| #25.033.R1 | PT Universal Respati Turbine Engineering | Welding Repair Compressor Impeller | 285 Days | |
| #25.034 | PT Supreme Energy | Rebabbit Bearing Housing HWP | 285 Days |
| #25.040 | PT PLN Nusantara Power UP Gresik | Jasa Rebabbit Bearing Motor BFP | 284 Days | |
| #25.037 | PT Makassar Tene | Machining Journal Coalmill & Rebabit Bearing | 283 Days | |
| #25.041.R1 | PT PLN Nusantara Power UP Gresik | Jasa Rebabbit Bearing Turbin No 1 & 2 | 276 Days | |
| #25.035 | PT PLN Nusantara Power Services | Fabrikasi Part Turbin PLTU Nii Tanasa Kendari | 261 Days |
| #25.044 | PT Pupuk Sriwidjaja Palembang | Repair Bearing F4A-105JLP Turn Around P-IV | 254 Days | |
| #25.047 | PT PLN Nusantara Power Services | Jasa Repair Oil Deflector #1, #2, #3, #4, Manufacture Air Seal Generator, dan Manufacture Nut | 252 Days | |
| #25.043 | PT PLN Nusantara Power Services | Pengadaan Jasa Fabrikasi 1 Set Upper Bearing Oil Deflector PLTA Asahan (WO76117) | 250 Days | |
| #25.042 | PT Rajamandala Electric Power | Inspection and Repairment Of Shaft Seal and Sliding Plate | 243 Days |
| #25.051 | PT PLN Nusantara Power UP Gresik | Jasa Rebabbit Bearing Motor BFP PLTU 3 | 240 Days | |
| #25.046.R1 | PT Rajamandala Electric Power | Fabrikasi Spring and Plug | 239 Days | |
| #25.049 | PT. Mogen Mechtric Power | Jasa Rebabbit Bearing Generator DE dan NDE | 239 Days | |
| #25.053 | PT PLN Nusantara Power UMRO | Jasa Rebabbit Bearing Turbin OH GI+ PLTA Tonsealama #1 Tahun 2025 | 231 Days |
| #25.052 | PT PLN Nusantara Power UP Gresik | Jasa Rebabbit Bearing FDF PLTU 3 | 222 Days | |
| #25.055 | PT. Sumber Segara Primadaya.( S2P ) | Jasa Perbaikan Shaft FGD Absorber Pump B (RFM-2025-070) | 218 Days | |
| #25.057 | PT PLN Nusantara Power Services | Jasa Rebabbit Bearing Pompa BFP PLTU Sumbawa | 214 Days | |
| #25.058 | PT PLN Nusantara Power Services | Jasa Rebabbit Bearing Generator, Repair Oil Deflector dan Fabrikasi Air Seal | 214 Days |
| #25.062 | PT PLN Indonesia Power UBP Jeranjang | Jasa Perbaikan Oil Deflector Turbine | 211 Days | |
| #25.059 | PT PLN Nusantara Power Services | Pengadaan Jasa Fabrikasi Oil Proof Bearing No 3 Unit PLTU Ketapang | 208 Days | |
| #25.061 | PT PLN Nusantara Power Services | Jasa Penormalan Kebocoran Line Split Casing GV Dalam Rangkas Additional Job Mean Inspection PLTU Nii Tanasa Kendari Unit 3 | 208 Days | |
| #25.063 | PT PLN Nusantara Power UMRO | Jasa Perbaikan Oil Deflector Bearing #7 Inboard dan Outboard PLTU Rembang | 206 Days |
| #25.064 | PT PLN Nusantara Power UMRO | Jasa Perbaikan Oil Deflector #3 PLTU Rembang | 204 Days | |
| #25.060 | PT PLN Nusantara Power Services | Pengadaan Material Fabrikasi dan Pemasangan Gland Sleeve Rotor sisi HP Unit 1 PLTU Ketapang | 202 Days | |
| #25.065 | PT PLN Nusantara Power UMRO | Pengadaan Jasa Rebabbit Seal Ring Generator PLTU Rembang | 202 Days | |
| #25.071 | PT PLN Indonesia Power UBP Kamojang | Repair Casing Turbin 2.5 MW General Electric Model : CL 55 HP (Subcontractor PT Digi Tekno Indonesia) | 197 Days |
| #25.068 | PT PLN Nusantara Power Services | Jasa Fabrikasi Spring Plate Short and Long PLTU Ketapang | 196 Days | |
| #25.066 | PT PLN Nusantara Power Services | Jasa Pembongkaran, Pemasangan Gland Sleeve Sisi LP dan Fabrikasi Part Turbin PLTU Ketapang | 193 Days | |
| #25.067.R1 | PT PLN Nusantara Power Services | Jasa Repair Part Turbin 1 PLTU Ketapang | 193 Days | |
| #25.070 | PT PLN Nusantara Power Services | Jasa Rebabbit Bearing Pompa BFP A & BFP B PLTU Nii Tanasa Kendari | 193 Days |
| #25.069 | PT PLN Nusantara Power Services | Jasa On site Low Speed Balancing Rotor Turbin PLTU Ketapang | 190 Days | |
| #25.054.R1 | PT PLN Nusantara Power Services | Pengadaan Jasa Rebabbit Bearing Turbin No 1,2,3,4 Unit 1 PLTU Ampana | 188 Days | |
| #25.050 | PT Kilang Pertamina Internasional RU V Balikpapan | Revisi & Update Jasa Overhaul Turbine, Gearbox dan Blower di Boiler HHP V | 185 Days | |
| #25.072 | PT Inti Karya Persada Teknik | Jasa Pengecekan Vibrasi dan Analisa Vibrasi Pompa Condensate PLTP Belawan Ijen | 184 Days |
| #25.048 | PT Kilang Pertamina Internasional RU II Dumai | Pengadaan HP & LP Packing Tag No. 301-CT-1 RU II Dumai | 179 Days | |
| #25.073 | PT PLN Nusantara Power Services | Pengadaan Jasa Perbaikan Oil Deflector Bearing 3 Unit PLTU Ketapang | 177 Days | |
| #25.076 | PT Inti Karya Persada Teknik | Welding Repair Vacuum Pump Casing | 173 Days | |
| #25.075 | PT Bakti Nugraha Yuda Energy | Repair Turning Gear Set Turbin PLTU Baturaja | 168 Days |
| #25.077.R1 | PT PLN Nusantara Power Services | Fabrikasi Ferrule Gland Sleeve Sisi HP dan Pemasangan di Site Turbine Unit 2 PLTU Suge - Belitung | 162 Days | |
| #25.080 | PT PLN Nusantara Power Services | Jasa Repair Oil Deflector Bearing 1&2 Unit 2 PLTU Suge Belitung | 160 Days | |
| #25.078 | PT Karya Patra Utama | Balancing with Assy Rotor Blower 15-K-102 | 158 Days | |
| #25.082 | PT Inti Karya Persada Teknik | Onsite Vibration Analysis for Vacuum Pump | 157 Days |
| #25.074 | PT PLN Nusantara Power Services | Pengadaan Jasa Perbaikan 2 Set Rotation Ring PLTA Asahan (WO76116) | 152 Days | |
| #25.081 | PT Mega Surya Eratama | Jasa Rebabbit Bearing Gear Box Turbine | 152 Days | |
| #25.083.R1 | PT PLN Nusantara Power Services | Jasa Penggantian Gland Sleeve Sisi LP Rotor TurbinUnit 2 PLTU Bolok | 144 Days | |
| #25.084 | PT Bakti Nugraha Yuda Energy | Spring Steam Seal Labirint Seal | 142 Days |
| #25.056.R1 | PT Kilang Pertamina Internasional RU II Dumai | Fabrikasi Material Non OEM Equipment 211-P-5A, 212-PT-4B, 212-PT-14B, 300-PT-9B, 310-C-1, 930-P-208 dan 211/212-P-34 A/B di RU II Dumai PT Kilang Pertamina Internasional | 137 Days | |
| #25.085 | PT Mega Surya Eratama | Repair Rotor Turbin & Blade Carier Turbin | 132 Days | |
| #25.086.R1 | PT Pupuk Kalimantan Timur | Jasa Fabrikasi Bearing HP Pump 2-P-102 A/B P3 & 307 JA P2 | 127 Days | |
| #25.091 | PT Tirta Mukti Lestari | Jasa Machining Runner dan Machining Wearing PLTM Cibuni | 109 Days |
| #25.079 | PT Saka Indonesia Pangkah Limited | Provision of Centrifugal Pump Overhaul for WIP-A Services | 108 Days | |
| #25.093 | PT Mega Surya Eratama | Perbaikan Rotor Turbin Unit 2 | 107 Days | |
| #25.094 | PT PLN Nusantara Power Services | Jasa Manufacture Air Seal PLTU Bangka | 105 Days | |
| #25.200 | PT Japa Indotama | Adm & Office Facility | 101 Days |
| #25.210 | PT Japa Indotama | Maintenance Facility and Machine | 101 Days | |
| #25.220 | PT Japa Indotama | Trainning, Studying and Marketing | 101 Days | |
| #25.230 | PT Japa Indotama | Business and Development | 101 Days | |
| #25.090 | PT Pupuk Kalimantan Timur | Jasa Manufacture Cutless Bearing Lower Pompa Laut Pabrik 3 | 99 Days |
| #25.092.R1 | PT PLN Nusantara Power Services | Jasa Rebabbit Bearing 5 Exciter PLTU Bangka | 90 Days | |
| #25.095 | PT PLN Nusantara Power Services | Jasa Rebabbit Bearing Turbine Generator 1, 2 & 3 Dalam Rangka Additional Job Serious Inspection PLTU Anggrek Unit 1 | 90 Days | |
| #26.006 | PT PLN Nusantara Power UMRO | Pengadaan Jasa Rebabbit Oil Keeper Generator | 84 Days | |
| #26.001 | PT PLN Nusantara Power Services | Pengadaan Material dan Jasa Strategic Part Turbin dan Auxiliary PLTU Nii Tanasa (Innerpart Turbin Unit 2) | 81 Days |
| #26.002 | PT PLN Nusantara Power Services | Jasa Repair Gland Seal Front, Rear PLTU Anggrek Gorontalo | 81 Days | |
| #26.003 | PT PLN Nusantara Power Services | Jasa Repair Gland Seal Front, Rear PLTU Anggrek Gorontalo | 81 Days | |
| #26.004 | PT PLN Nusantara Power Services | Jasa Rekondisi Oil Deflector 1, Oil Deflector 2, Oil Deflector 3, Oil Deflector 4 TS, Oil Deflector 4 GS dan Manufacture Air Seal PLTU Anggrek Gorontalo | 81 Days | |
| #25.045 | PT Kilang Pertamina Internasional RU VI Balongan | Preventive Maintenance & Overhaul 8 Unit Reciprocating Compressor – RKAP 2025 | 76 Days |
| #26.018 | PT Triguna Mandala | Generator Rotor Roughness Test | 67 Days | |
| #25.087.R1 | PT Gula Putih Mataram | Repair Turbin Feed Water Pump for Yoshimine (Turbine Type HO-163) Factory PT GPM | 63 Days | |
| #26.010 | PT PLN Nusantara Power Services | Jasa Rebabbit Bearing Turbin No. 2, Bearing Generator No. 3, Repair Oil Deflector dan Fabrikasi Air Seal Generator Unit 2 PLTU Sumbawa | 62 Days | |
| #26.014 | PT PLN Indonesia Power UBP Jeranjang | Jasa Repair Seal Deflector dan Spring Plate Bearing Turbine Unit 2 PLTU Jeranjang | 61 Days |
| #26.016 | PT PLN Nusantara Power UP Pacitan | Jasa Rebabbit Bearing Generator #5 UP Pacitan | 61 Days | |
| #26.019 | PT Nindya Karya (Persero) | Incoming Inspection Gear Box | 52 Days | |
| #26.005 | PT Amman Mineral Nusa Tenggara | Repair & Return of ID Fan Shaft | 47 Days | |
| #26.011.R1 | PT Fuji Electric Indonesia | Additional Inspection for MLB1 Rotor | 42 Days |
| #26.007 | PT Gula Putih Mataram | Fabrikasi Drive Shaft (Hein Lehmann) Continuous Centrifugal Machine | 40 Days | |
| #26.020 | PT Kaltimex Energy | Reblading (Parsial) & Recoating Shaft | 32 Days | |
| #26.015.R3 | PT Supreme Energy | Provision of Rebabbitt Bearing TG and Housing Bearing HWP | 31 Days | |
| #26.021 | PT Sinergy Power Source | Jasa Rebabbit Bearing Generator dan Bearing Turbin | 28 Days |
| #26.008.R1 | PT PLN Mandau Cipta Tenaga Nusantara | Seal Strip of Compressor Stator Replacement SGT6-3000 | 14 Days | |
| #26.012.R2 | PT PLN Mandau Cipta Tenaga Nusantara | Jasa Penyediaan dan Perbaikan Komponan Turbin Unit-3 | 14 Days | |
| #26.029 | PT Digi Tekno Indonesia | Jasa Low Speed Balancing Rotor Motor 37 KW | 10 Days | |
| #26.026 | PT Rajamandala Electric Power | Pemeliharaan Saluran Sirkulasi Udara | 7 Days |
| #26.022 | PT Pertamina Patra Niaga RU VI Balongan | Rebbabit Crosshead Shoe Plate 12-K-501C | 5 Days | |
| #25.021 | PT Kilang Pertamina Internasional RU III Plaju | Overhaul Kompresor 23-K-2001 A & B Kilang Polypropylene Plaju | 2 Days | |
| #26.024 | PT Nindya Karya (Persero) | Refurbish Gearbox Unit | 1 Days |
| #26.024 | PT Nindya Karya (Persero) | Refurbish Gearbox Unit | Due 1 Days | |
| #26.032 | PT Rajamandala Electric Power | Perbaikan Back Draft Dumper | Due 3 Days | |
| #26.023 | PT PLN Mandau Cipta Tenaga Nusantara | Jasa Machining GT Compressor Casing Unit-3 | Due 4 Days | |
| #26.033 | PT PLN Nusantara Power UMRO | Jasa Repair Outer Oil Deflector Bearing 6 Generator OH SE #1 UP Tj. Awar – Awar 2026 | Due 6 Days |
| #26.027.R1 | PT PLN Mandau Cipta Tenaga Nusantara 2026-05-01 2026-04-17 jumlah 13 | Jasa Coating Blade GT Compressor Diaphragm dan 3D Scanning Compressor Unit-3 | Due 10 Days |
| #25.088.R1 | PT Kilang Pertamina Internasional RU VI Balongan | Overhaul Pompa 12-P-501A dan 12-P-501B – RKAP 2025 | Due 23 Days | |
| #26.028 | PT Pertamina Patra Niaga RU III Plaju | Preventive Maintenance & Overhaul Peralatan Rotating Kilang FCCU dan HVU II saat Pit Stop Tahun 2026 | Due 23 Days | |
| #26.013 | PT Kilang Pertamina Internasional RU III Plaju | Jasa Overhaul 23-K-2208 Recycle Hydrogen Compressor Kilang Polypropylene Plaju | Due 25 Days | |
| #26.031 | PT Karya Patra Utama | Fabrikasi Shaft IDF 12K 102 | Due 25 Days | |
| #26.025.R1 | PT Tujuh Tujuh Adhitama | Perbaikan 1 Unit Transfer Pump Ruhrpumpen JTN-06 di SPU A | Due 30 Days |