WORK ORDER STATUS
First slide

#23.058.R2 PT Kilang Pertamina Internasional RU V Balikpapan Jasa Overhaul Blower dan Turbine di Boiler HHP-3 694 Days FIELD SERV (06-09-2024) - HOLD ( Waiting Electro Motor / Driven ).
#24.010 PT Pupuk Kalimantan Timur Rebabbit Bearing GB-603 Pabrik 5 679 Days PRODUCTION (06-09-2024) - Trial to Babbit Gr 7,,
#24.003.R3 PT Kilang Pertamina Internasional RU V Balikpapan Jasa Perbaikan Pompa G-201-13B 627 Days PRODUCTION (23-07-2024) - Dismantling & Cleaning Parts of Pump
#24.023.R1 PT Kilang Pertamina Internasional RU V Balikpapan Refurbishment Rotor Blower Induced Draft Fan K-8-02A 591 Days

First slide

#24.042 PT Kilang Pertamina Internasional RU IV Cilacap Pekerjaan Refurbishment Rotor & Bearing Housing Ex-Running Turbine 101P522BT PT Kilang Pertamina Internasional RU IV Cilacap 542 Days QC (06-09-2024) - Waiting customer witness
#24.052.R1 PT PLN Nusantara Power UP Gresik Rebabit Bearing Force Draft Fan Sisi DE dan NDE PLTU 4 527 Days QC (06-09-2024) - Witness customer 5 September 2024( OK )
#24.061 PT PLN Indonesia Power PLTU Jeranjang Jasa Manufacture Labyrinth Seal Sisi Inner DE, Sisi Outer NDE & Ring Oil Sisi DE 525 Days QC (06-09-2024) - Finish 98% ( final Inspeksi )
#24.056.R1 PT Japa Indotama Fabrikasi & Modifikasi Vertical Mobile Lathe 523 Days FIELD SERV (06-09-2024) - On Process Design Structure/ Konstruksi .

First slide

#24.057 PT PLN Nusantara Power UP Gresik Rebabit Journal Bearing Auxiliary Gear GT No. 3,4,5 dan 6 untuk PT PLN NP Unit Pembangkitan Gresik 522 Days QC (06-09-2024) - Finish 100%, Waiting witness customer
#24.009 PT Kilang Pertamina Internasional RU V Balikpapan Jasa Overhaul Turbine, Gearbox dan Blower di Boiler HHP V 520 Days SALES & MK (19-08-2024) - Waiting KOM..tentative starting November 2024
#24.064 PT PLN Nusantara Power UMRO Jasa Repair Oil Deflector Generator OH SE Unit 2 Up Kaltim Teluk Tahun 2024 520 Days PRODUCTION (06-09-2024) - On process Install Seal
#24.065 PT PLN Nusantara Power UMRO Jasa Repair Air Seal Generator OH SE Unit 2 UP Kaltim Teluk Tahun 2024 520 Days PRODUCTION (06-09-2024) - On Process Machining Seal

First slide

#24.050 PT PLN Nusantara Power Services Pengadaan Additional Scope SE Fabrikasi & Pemasangan Gland Sleeve Outboard Sisi HP & LP Turbine Unit 2 PLTU Ketapang 519 Days PRODUCTION (06-09-2024) - Preparation Tools On Site Service ( estimasi on site 25 spetember )
#24.066 PT PLN Nusantara Power UP Kaltim Teluk Jasa Rebabbit Bearing BFP dan Generator #6 517 Days PRODUCTION (06-09-2024) - On Process Rebabbit ( 35% )
#24.068 PT PLN Nusantara Power Services Repair Oil Deflector No. 3 & 4 Unit 1 PLTU Amurang 514 Days LOGISTIC (06-09-2024) - On Process Pengambilan Excisting Parts ke Bandara
#24.069 PT PLN Nusantara Power Services Pengadaan Jasa Perbaikan Oil Deflector Turbin Unit 1 PLTU Amurang 2024 507 Days

First slide

#24.039 PT Kilang Pertamina Internasional RU II Dumai Perbaikan 1 (Satu) Unit Turbine 940-CT-53 503 Days QC (06-09-2024) - On Process Report dan ambil data untuk syarat witness customer
#24.063 PT Green Lahat Jasa Manufaktur Wearing Drive Side, Wearing No Drive Side dan Oil Deflector 500 Days PRODUCTION (06-09-2024) - Roughing process
#24.074 PT PLN Nusantara Power Services Pengadaan Material Spring Plate Turbin PLTU Ropa 496 Days
#24.075 PT PLN Nusantara Power Services Fabrikasi dan Penggantian Seal Strip HP Gland Seal Rotor Turbin PLTU Tidore 495 Days

First slide

#24.076 PT PLN Nusantara Power Services Penggantian Seal Strip Interstage Labyrinth Seal Turbin PLTU Tidore 495 Days
#24.077.R1 PT PLN Nusantara Power Services Rebabbit Bearing BFP PLTU Tidore 495 Days
#24.073.R1 PT Pura Daya Prima Jasa Rebabbit Bearing No. 1, 2, 3, 4 dan Bearing Spare 1 & 2, Penggantian Seal Oil Deflector dan Manufacture Air Seal 494 Days
#24.060.R1 PT PLN Indonesia Power PLTU Barru Operation And Maintenance Service Unit Fabrikasi Shaft dan Assembly - Disassembly Pompa BFP 493 Days QC (06-09-2024) - Incoming Parts belum sesuai kontrak, sdg proses Marketing

First slide

#24.079 PT Supreme Energy Provision of Vacuum Pump Bearing Replacement 491 Days
#24.054 PT Kilang Pertamina Internasional RU II Dumai Pengadaan Material Non OEM Pulley Drill Steam Chamber Tag No.140-V-1B 489 Days PRODUCTION (06-09-2024) - On Progress Parts Mfg 70 % & Supply Parts 100 %
#24.072 PT Cikarang Listrindo Tbk Jasa Replacement Blade Rotor Turbine Las Stage Blade (2 EA) & Jasa Low Speed Balancing Turbine Rotor 487 Days
#24.070 PT Pura Daya Prima Jasa Overhaul Steam Turbine Generator PLTGU Musi Dua 486 Days

First slide

#24.083 PT PLN Nusantara Power Services Repair Oil Seal & Fabrikasi Spring Plate Turbin PLTU Ketapang 486 Days
#24.008.R2 PT Kilang Pertamina Internasional RU V Balikpapan Jasa Overhaul Turbine, Gearbox dan Blower di Boiler HHP IV 480 Days QC (06-09-2024) - Preparation Summary Report, Checklist Parts, dokumen inspeksi awal
#24.055.R1 PT Kaltimex Energy Manufacturing Guide Ring, Nozzle Ring & Repair Turbine model 703 W (PT.KSA) 479 Days ENGINEER (06-09-2024) - Waiting Parts Sample .
#24.081 PT PLN Nusantara Power Services Jasa Perbaikan Labyrinth Turbine Unit 2 PLTU Amurang 479 Days

First slide

#24.087 PT PLN Nusantara Power Services Fabrikasi Material Spring Labyrinth Turbine Unit 2 PLTU Amurang 479 Days
#24.085 PT PLN Nusantara Power UMRO Jasa Rebabbit H2 Seal, Bearing 5 dan 6 Generator OH ME+ #10 UP Rembang Tahun 2024 478 Days
#24.089 PT PLN Nusantara Power UMRO Jasa Penggantian Seal Carbon Teflon (Hybess 230) 476 Days
#24.091 PT Green Lahat Jasa Machining Runner 475 Days

First slide

#24.088 PT PLN Nusantara Power Services Pengadaan Jasa Rebabbit No. 2 Turbine Unit 2 PLTU Ampana 473 Days
#24.092 PT PLN Nusantara Power Services Fabrikasi Ferrule Gland Sleeve Sisi HP dan Pemasangan di Site PLTU Suge - Belitung 468 Days
#24.095 PT PLN Nusantara Power Services Jasa Penggantian Seal Strip LP Gland Seal Turbin PLTU Ampana 456 Days
#24.071 PT PLN Indonesia Power Services Pengadaan Jasa Rebabit Journal Bearing, Repair Oil Deflector dan Repair Gland Seal SE Unit 1 PLTU Tanjung Balai Karimun 452 Days

First slide

#24.096 PT PLN Nusantara Power UP Kaltim Teluk Jasa Rebabbit Bearing Generator #6 449 Days
#24.098 PT PLN Nusantara Power UMRO Jasa Rebabbit Bearing Motor PAF OH SI+ Unit 9 UP Paiton 2024 445 Days
#24.084 PT Supreme Energy Provision of Portable Lathe Rental Services for Major Outage 2024 442 Days
#24.080 PT PLN Nusantara Power Services Pengadaan Jasa Repair BFP A PLTU Ropa (WO82900) 441 Days

First slide

#24.097 PT. Sumber Segara Primadaya.( S2P ) Jasa Perbaikan Shaft FGD Absorber Pump B (RFM-2024-093) 434 Days
#24.099 PT PLN Nusantara Power Services Jasa Fabrikasi Shaft dan Coupling SA Fan Dalam Rangka Additional Job Serious Inspection Unit 2 PLTU Tidore 434 Days
#24.100 PT PLN Nusantara Power UP Gresik Jasa Rebabbit Bearing Generator GT 1.1 432 Days
#24.104 PT Ampera Musi Indah Raya Inspection Rotor Ruhrpumpen Pump 431 Days

First slide

#24.058.R1 PT Ampera Musi Indah Raya Inspection and Replacement New Rotor Ruhrpumpen Pump di SB Cilamaya OGT Field 427 Days PRODUCTION (06-09-2024) - Reschedule to persiapan on site
#24.090 PT Kilang Pertamina Internasional RU VI Balongan Refurbisment Rotor 11-K-101 & 22-K-103 –EX Major TA 2022 427 Days
#24.102 PT Pemukasakti Manisindah Rebbabit Bearing For Pinion Gear 426 Days
#24.082.R1 PT PLN Indonesia Power PLTU Jeranjang Jasa Revitalisasi Vacum Pump UBP Jeranjang 421 Days

First slide

#24.106 PT Supreme Energy Machining to Removing Blade Stage #1 & #2 on Mobile Lathe Machine for Supreme Energy Muara Laboh (SEML) 419 Days
#24.103 PT PLN Nusantara Power UP Gresik Rebabbit Bearing FD FAN Sisi DE PLTU #4 416 Days
#24.107 PT PLN Nusantara Power Services Fabrikasi Spring Plate Turbin PLTU Ketapang 416 Days
#24.108 PT Makassar Tene Jasa Rekondisi Rotor Motor 90 KW Screw Compressor 411 Days

First slide

#24.111 PT PLN Nusantara Power Services Incoming Inspection Pompa CWP PLTU Ketapang 400 Days
#24.105 PT PLN Nusantara Power UPK Punagaya Pengadaan Plate Coupling Fan Boiler Dan BFP Serious Inspection Unit 1 Tahun 2025 395 Days
#24.110 PT PLN Nusantara Power Services Jasa Repair Labyrinth / Gland Seal Dalam Rangka Additional Job Serious Inspection Unit 2 PLTU Tidore 395 Days
#25.001 PT Global Mandira Semesta Balancing Classifier Rotor 388 Days

First slide

#24.086 PT Kilang Pertamina Internasional RU II Dumai Pengadaan Spare Part Non OEM Turbine Tag No. 212-PT-75 PT Kilang Pertamina Internasional RU II Dumai 381 Days
#24.109 PT Inti Karya Persada Teknik Re-Assembly & Commisioning STG Timor-1 Coal Fired Steam Power Plant (CFSPP) 2x50 MW 377 Days
#25.005.R1 PT PLN Nusantara Power Services Fabrikasi Spring Plate PLTU Tidore Unit 2 dan Penggantian Seal Strip HP Gland Seal Sisi Inner Stator Turbin 371 Days
#25.003 PT PLN Nusantara Power Services Overhaul Pump CWP No. 3 PLTU Ketapang 365 Days

First slide

#25.004 PT Supreme Energy Steam Turbine Rotor (Ex-Running) Unit #1 SEML 364 Days
#25.006 PT PLN Nusantara Power UP Kaltim Teluk Jasa Fabrikasi Dummy Shaft 363 Days
#25.008 PT PLN Nusantara Power Services Jasa Repair Oil Deflector Bearing no 1 dan Bearing no 2 355 Days
#25.009 PT PLN Nusantara Power UPK Punagaya Jasa Rebabbit Bearing Turbin no.2 dan Bearing Turbin no.3 355 Days

First slide

#25.007 PT PLN Nusantara Power Services Penggantian Gland Sleeve Rotor Turbin Sisi LP (Inboard dan Outboard) 353 Days
#25.002 PT Kilang Pertamina Internasional RU III Plaju Jasa Overhaul Peralatan Rotating Unit Polypropylene Pada Kegiatan Yearly Maintenance Tahun 2025 351 Days
#25.010 PT PLN Nusantara Power Services Jasa Pembongkaran dan Pemasangan Gland Sleeve Sisi HP Rotor Turbin PLTU Bolok 348 Days
#25.011 PT PLN Nusantara Power Services Jasa Fabrikasi Air Seal Generator #3 dan #4 PLTU Ketapang 348 Days

First slide

#25.012 PT Green Lahat Jasa Manufacture Spesial Tools For Runner 348 Days
#25.015 PT PLN Nusantara Power UMRO Jasa Repair Inner Oil Deflector Sisi Turbine Side dan Exciter Side OH SE Unit 1 UP Pacitan 2025 347 Days
#25.014 PT Pemukasakti Manisindah Rebbabit Bearing For Pinion Gear 344 Days
#24.094 PT Kilang Pertamina Internasional RU VI Balongan Overhaul Reciprocating Compressor 12-K-501A, 12-K-501B, 22-K-101B, 21-K-101A RKAP 2024 335 Days

First slide

#25.016 PT PLN Nusantara Power UP Tanjung Awar-Awar Jasa Machining Inner Part BFPT 331 Days
#24.101 PT Kilang Pertamina Internasional RU V Balikpapan Pengadaan Material Fabrikasi Part G-33-01 ABCD 322 Days
#24.078.R1 PT Kilang Pertamina Internasional RU III Plaju Overhaul Pompa dan Turbine Boiler Feed Water P-2008 JA/JAT dan P-2008 JB/JBM 316 Days
#24.093 PT Kilang Pertamina Internasional RU V Balikpapan Jasa Overhaul Pompa Vertikal P-6 RPAL 314 Days

First slide

#25.013 PT Kilang Pertamina Internasional RU II Dumai Perbaikan Part Engine 970-PD-01D 311 Days
#25.018 PT PLN Nusantara Power Services Pengadaan Material dan Jasa Instalasi Temporary Tapping Piping HSD Dalam Rangka Relokasi PLTG MPP Tarahan #1 ke Sistem Kelistrikan Sulbagsel (Punagaya) 303 Days
#25.017 PT Kilang Pertamina Internasional RU VI Balongan Overhaul Pompa 12-P-501A dan 12-P-501B-RKAP 2023 (Warranty Job 24.004) 298 Days
#25.025 PT PLN Nusantara Power UMRO Jasa Rebabbit Bearing Motor CWP B OH ME+ #2 UP Paiton 2025 276 Days

First slide

#25.022 PT Bakti Nugraha Yuda Energy Repair Main Oil Pump Rotor Turbin PLTU Baturaja 275 Days
#25.020 PT Bakti Nugraha Yuda Energy Major Overhaul Steam Turbine Generator 265 Days
#25.027 PT Green Lahat Jasa Reverse Engineering Drawing Wearing DE, Wearing NDE dan Cover Drive Side 262 Days
#25.029 PT Digi Tekno Indonesia Jasa Low Speed Balancing Rotor Motor 252 Days

First slide

#25.028 PT PLN Nusantara Power Services Jasa Manufaktur Gland Housing Sisi HP Outer Middle Turbin Unit 2 PLTU Ropa 248 Days
#25.019 PT Bhumi Jati Power Mechanical Work of Condenser Vacuum Pump During U5 Major Maintenance 247 Days
#25.030 PT PLN Nusantara Power Services Jasa Fabrikasi Bearing Chain Grate 246 Days
#25.036 PT PLN Indonesia Power UBP Jeranjang Jasa Perbaikan Oil Deflector, Fabrikasi Spring dan Baut 237 Days

First slide

#25.032 PT PLN Nusantara Power Services Jasa Repair Oil Deflector No 3 dan Fabrikasi Air Seal Generator 236 Days
#25.038 PT PLN Indonesia Power UBP Jeranjang Jasa Perbaikan Oil Deflector dan Fabrikasi Air Seal 236 Days
#25.023 PT Karya Patra Utama Fabrikasi Inner Part 12-FV-030 234 Days
#25.031 PT PLN Nusantara Power Services Penggantian Gland Sleeve Rotor Turbin PLTU Tembilahan 234 Days

First slide

#25.039 PT PLN Nusantara Power UP Pacitan Jasa Rebabit Seal Ring Generator - MO LIS 227 Days
#25.026 PT PLN Indonesia Power UBP Sintang Jasa Overhaul MI Inspeksi Turbin Unit 3 PLTU Sintang Tahun 2025 224 Days
#25.033.R1 PT Universal Respati Turbine Engineering Welding Repair Compressor Impeller 224 Days
#25.034 PT Supreme Energy Rebabbit Bearing Housing HWP 224 Days

First slide

#25.040 PT PLN Nusantara Power UP Gresik Jasa Rebabbit Bearing Motor BFP 223 Days
#25.037 PT Makassar Tene Machining Journal Coalmill & Rebabit Bearing 222 Days
#25.041.R1 PT PLN Nusantara Power UP Gresik Jasa Rebabbit Bearing Turbin No 1 & 2 215 Days
#25.035 PT PLN Nusantara Power Services Fabrikasi Part Turbin PLTU Nii Tanasa Kendari 200 Days

First slide

#25.044 PT Pupuk Sriwidjaja Palembang Repair Bearing F4A-105JLP Turn Around P-IV 193 Days
#25.047 PT PLN Nusantara Power Services Jasa Repair Oil Deflector #1, #2, #3, #4, Manufacture Air Seal Generator, dan Manufacture Nut 191 Days
#25.043 PT PLN Nusantara Power Services Pengadaan Jasa Fabrikasi 1 Set Upper Bearing Oil Deflector PLTA Asahan (WO76117) 189 Days
#25.042 PT Rajamandala Electric Power Inspection and Repairment Of Shaft Seal and Sliding Plate 182 Days

First slide

#25.051 PT PLN Nusantara Power UP Gresik Jasa Rebabbit Bearing Motor BFP PLTU 3 179 Days
#25.046.R1 PT Rajamandala Electric Power Fabrikasi Spring and Plug 178 Days
#25.049 PT. Mogen Mechtric Power Jasa Rebabbit Bearing Generator DE dan NDE 178 Days
#25.053 PT PLN Nusantara Power UMRO Jasa Rebabbit Bearing Turbin OH GI+ PLTA Tonsealama #1 Tahun 2025 170 Days

First slide

#25.052 PT PLN Nusantara Power UP Gresik Jasa Rebabbit Bearing FDF PLTU 3 161 Days
#25.055 PT. Sumber Segara Primadaya.( S2P ) Jasa Perbaikan Shaft FGD Absorber Pump B (RFM-2025-070) 157 Days
#25.057 PT PLN Nusantara Power Services Jasa Rebabbit Bearing Pompa BFP PLTU Sumbawa 153 Days
#25.058 PT PLN Nusantara Power Services Jasa Rebabbit Bearing Generator, Repair Oil Deflector dan Fabrikasi Air Seal 153 Days

First slide

#25.062 PT PLN Indonesia Power UBP Jeranjang Jasa Perbaikan Oil Deflector Turbine 150 Days
#25.059 PT PLN Nusantara Power Services Pengadaan Jasa Fabrikasi Oil Proof Bearing No 3 Unit PLTU Ketapang 147 Days
#25.061 PT PLN Nusantara Power Services Jasa Penormalan Kebocoran Line Split Casing GV Dalam Rangkas Additional Job Mean Inspection PLTU Nii Tanasa Kendari Unit 3 147 Days
#25.063 PT PLN Nusantara Power UMRO Jasa Perbaikan Oil Deflector Bearing #7 Inboard dan Outboard PLTU Rembang 145 Days

First slide

#25.064 PT PLN Nusantara Power UMRO Jasa Perbaikan Oil Deflector #3 PLTU Rembang 143 Days
#25.060 PT PLN Nusantara Power Services Pengadaan Material Fabrikasi dan Pemasangan Gland Sleeve Rotor sisi HP Unit 1 PLTU Ketapang 141 Days
#25.065 PT PLN Nusantara Power UMRO Pengadaan Jasa Rebabbit Seal Ring Generator PLTU Rembang 141 Days
#25.071 PT PLN Indonesia Power UBP Kamojang Repair Casing Turbin 2.5 MW General Electric Model : CL 55 HP (Subcontractor PT Digi Tekno Indonesia) 136 Days

First slide

#25.068 PT PLN Nusantara Power Services Jasa Fabrikasi Spring Plate Short and Long PLTU Ketapang 135 Days
#25.066 PT PLN Nusantara Power Services Jasa Pembongkaran, Pemasangan Gland Sleeve Sisi LP dan Fabrikasi Part Turbin PLTU Ketapang 132 Days
#25.067.R1 PT PLN Nusantara Power Services Jasa Repair Part Turbin 1 PLTU Ketapang 132 Days
#25.070 PT PLN Nusantara Power Services Jasa Rebabbit Bearing Pompa BFP A & BFP B PLTU Nii Tanasa Kendari 132 Days

First slide

#25.069 PT PLN Nusantara Power Services Jasa On site Low Speed Balancing Rotor Turbin PLTU Ketapang 129 Days
#25.054.R1 PT PLN Nusantara Power Services Pengadaan Jasa Rebabbit Bearing Turbin No 1,2,3,4 Unit 1 PLTU Ampana 127 Days
#25.050 PT Kilang Pertamina Internasional RU V Balikpapan Revisi & Update Jasa Overhaul Turbine, Gearbox dan Blower di Boiler HHP V 124 Days
#25.072 PT Inti Karya Persada Teknik Jasa Pengecekan Vibrasi dan Analisa Vibrasi Pompa Condensate PLTP Belawan Ijen 123 Days

First slide

#25.048 PT Kilang Pertamina Internasional RU II Dumai Pengadaan HP & LP Packing Tag No. 301-CT-1 RU II Dumai 118 Days
#25.073 PT PLN Nusantara Power Services Pengadaan Jasa Perbaikan Oil Deflector Bearing 3 Unit PLTU Ketapang 116 Days
#25.076 PT Inti Karya Persada Teknik Welding Repair Vacuum Pump Casing 112 Days
#25.075 PT Bakti Nugraha Yuda Energy Repair Turning Gear Set Turbin PLTU Baturaja 107 Days

First slide

#25.077.R1 PT PLN Nusantara Power Services Fabrikasi Ferrule Gland Sleeve Sisi HP dan Pemasangan di Site Turbine Unit 2 PLTU Suge - Belitung 101 Days
#25.080 PT PLN Nusantara Power Services Jasa Repair Oil Deflector Bearing 1&2 Unit 2 PLTU Suge Belitung 99 Days
#25.078 PT Karya Patra Utama Balancing with Assy Rotor Blower 15-K-102 97 Days
#25.082 PT Inti Karya Persada Teknik Onsite Vibration Analysis for Vacuum Pump 96 Days

First slide

#25.074 PT PLN Nusantara Power Services Pengadaan Jasa Perbaikan 2 Set Rotation Ring PLTA Asahan (WO76116) 91 Days
#25.081 PT Mega Surya Eratama Jasa Rebabbit Bearing Gear Box Turbine 91 Days
#25.083.R1 PT PLN Nusantara Power Services Jasa Penggantian Gland Sleeve Sisi LP Rotor TurbinUnit 2 PLTU Bolok 83 Days
#25.084 PT Bakti Nugraha Yuda Energy Spring Steam Seal Labirint Seal 81 Days

First slide

#25.056.R1 PT Kilang Pertamina Internasional RU II Dumai Fabrikasi Material Non OEM Equipment 211-P-5A, 212-PT-4B, 212-PT-14B, 300-PT-9B, 310-C-1, 930-P-208 dan 211/212-P-34 A/B di RU II Dumai PT Kilang Pertamina Internasional 76 Days
#25.085 PT Mega Surya Eratama Repair Rotor Turbin & Blade Carier Turbin 71 Days
#25.086.R1 PT Pupuk Kalimantan Timur Jasa Fabrikasi Bearing HP Pump 2-P-102 A/B P3 & 307 JA P2 66 Days
#25.091 PT Tirta Mukti Lestari Jasa Machining Runner dan Machining Wearing PLTM Cibuni 48 Days

First slide

#25.079 PT Saka Indonesia Pangkah Limited Provision of Centrifugal Pump Overhaul for WIP-A Services 47 Days
#25.093 PT Mega Surya Eratama Perbaikan Rotor Turbin Unit 2 46 Days
#25.094 PT PLN Nusantara Power Services Jasa Manufacture Air Seal PLTU Bangka 44 Days
#25.200 PT Japa Indotama Adm & Office Facility 40 Days

First slide

#25.210 PT Japa Indotama Maintenance Facility and Machine 40 Days
#25.220 PT Japa Indotama Trainning, Studying and Marketing 40 Days
#25.230 PT Japa Indotama Business and Development 40 Days
#25.090 PT Pupuk Kalimantan Timur Jasa Manufacture Cutless Bearing Lower Pompa Laut Pabrik 3 38 Days

First slide

#25.092.R1 PT PLN Nusantara Power Services Jasa Rebabbit Bearing 5 Exciter PLTU Bangka 29 Days
#25.095 PT PLN Nusantara Power Services Jasa Rebabbit Bearing Turbine Generator 1, 2 & 3 Dalam Rangka Additional Job Serious Inspection PLTU Anggrek Unit 1 29 Days
#26.006 PT PLN Nusantara Power UMRO Pengadaan Jasa Rebabbit Oil Keeper Generator 23 Days
#26.001 PT PLN Nusantara Power Services Pengadaan Material dan Jasa Strategic Part Turbin dan Auxiliary PLTU Nii Tanasa (Innerpart Turbin Unit 2) 20 Days

First slide

#26.002 PT PLN Nusantara Power Services Jasa Repair Gland Seal Front, Rear PLTU Anggrek Gorontalo 20 Days
#26.003 PT PLN Nusantara Power Services Jasa Repair Gland Seal Front, Rear PLTU Anggrek Gorontalo 20 Days
#26.004 PT PLN Nusantara Power Services Jasa Rekondisi Oil Deflector 1, Oil Deflector 2, Oil Deflector 3, Oil Deflector 4 TS, Oil Deflector 4 GS dan Manufacture Air Seal PLTU Anggrek Gorontalo 20 Days
#25.045 PT Kilang Pertamina Internasional RU VI Balongan Preventive Maintenance & Overhaul 8 Unit Reciprocating Compressor – RKAP 2025 15 Days

First slide

#26.018 PT Triguna Mandala Generator Rotor Roughness Test 6 Days
#26.009 PT Triguna Mandala Repair/Re-Babbitt Bearings dan Manufacture Bearing Shoe 4 Days
#25.087.R1 PT Gula Putih Mataram Repair Turbin Feed Water Pump for Yoshimine (Turbine Type HO-163) Factory PT GPM 2 Days
#26.010 PT PLN Nusantara Power Services Jasa Rebabbit Bearing Turbin No. 2, Bearing Generator No. 3, Repair Oil Deflector dan Fabrikasi Air Seal Generator Unit 2 PLTU Sumbawa 1 Days

Second slide

#26.010 PT PLN Nusantara Power Services Jasa Rebabbit Bearing Turbin No. 2, Bearing Generator No. 3, Repair Oil Deflector dan Fabrikasi Air Seal Generator Unit 2 PLTU Sumbawa Due 1 Days
#26.014 PT PLN Indonesia Power UBP Jeranjang Jasa Repair Seal Deflector dan Spring Plate Bearing Turbine Unit 2 PLTU Jeranjang Due 2 Days
#26.016 PT PLN Nusantara Power UP Pacitan Jasa Rebabbit Bearing Generator #5 UP Pacitan Due 2 Days

Third slide

#26.008 PT PLN Mandau Cipta Tenaga Nusantara 2026-03-01 2026-02-15 jumlah 13 Seal Strip of Compressor Stator Replacement SGT6-3000 Due 13 Days
#26.012 PT PLN Mandau Cipta Tenaga Nusantara 2026-03-01 2026-02-15 jumlah 13 Fabrikasi Seal Torque Tube Due 15 Days
#26.005 PT Amman Mineral Nusa Tenggara 2026-03-01 2026-02-15 jumlah 13 Repair & Return of ID Fan Shaft Due 16 Days
#26.015.R1 PT Supreme Energy 2026-03-01 2026-02-15 jumlah 13 Provision of Rebabbitt Bearing TG and Housing Bearing HWP Due 17 Days
#26.011.R1 PT Fuji Electric Indonesia 2026-03-01 2026-02-15 jumlah 13 Additional Inspection for MLB1 Rotor Due 21 Days

Third slide

#26.005 PT Amman Mineral Nusa Tenggara Repair & Return of ID Fan Shaft Due 16 Days
#26.015.R1 PT Supreme Energy Provision of Rebabbitt Bearing TG and Housing Bearing HWP Due 17 Days
#26.011.R1 PT Fuji Electric Indonesia Additional Inspection for MLB1 Rotor Due 21 Days
#26.007 PT Gula Putih Mataram Fabrikasi Drive Shaft (Hein Lehmann) Continuous Centrifugal Machine Due 23 Days
#25.021 PT Kilang Pertamina Internasional RU III Plaju Overhaul Kompresor 23-K-2001 A & B Kilang Polypropylene Plaju Due 61 Days